After eight years of deciding a design for the Issam Fares Institute at the American University of Beirut, the building’s inauguration took place last week.
The building is full with the signature indicators of a Zaha Hadid building: asymmetry and the illusion of defiance to gravity. Like many modern, non-contemporary designs, the building gained mixed reviews among the architecture community and citizens of Beirut.
Standing at 22 meters with 6 floors, the building has a total site area of 7000 square meters and a total floor area of 3000 square meets.
Here is a description from the firm’s website:
“The Issam fares Institute for Public Policy and International Affairs building by Zaha Hadid Architects at the American University of Beirut continues the on-going implementation of the 2002 AUB Campus Master Plan by Sasaki Associates (in collaboration with Machado and Silvetii, MGT of America, and Dar Al-Handasa, Shair and Partners) to advance the university’s academic mission in the 21st century with facilities of the highest international standards.”
Related Stories
| May 29, 2012
Reconstruction Awards Entry Information
Download a PDF of the Entry Information at the bottom of this page.
| May 29, 2012
AIA expands Documents-On-Demand service??
Six new documents added, DOD offers nearly 100 contract documents.
| May 29, 2012
Legrand achieves over 20% energy-intensity reduction in Presidential Challenge
West Hartford headquarters announced as Better Buildings, Better Plants “Showcase” site.
| May 29, 2012
Thornton Tomasetti/Fore Solutions provides consulting for Phase I of Acadia Gateway Center
Project receives LEED Gold certification.
| May 24, 2012
2012 Reconstruction Awards Entry Form
Download a PDF of the Entry Form at the bottom of this page.
| May 24, 2012
Gilbane’s Spring 2012 economic report identifies multiple positive economic and market factors
Anticipating increasing escalation in owner costs through 2014.
| May 24, 2012
Construction backlog declines 5.4% in the first quarter of 2012?
The nation’s nonresidential construction activity will remain soft during the summer months, with flat to declining nonresidential construction spending.
| May 24, 2012
Stellar completes St. Mark’s Episcopal Church and Day School renovation and expansion
The project united the school campus and church campus including a 1,200-sf chapel expansion, a new 10,000-sf commons building, 7,400-sf of new covered walkways, and a drop-off pavilion.
| May 23, 2012
MBI Modular Construction Campus Launched on BDCUniversity.com
White Papers, Case Studies, Industry Annual Reports, published articles and more are offered.