flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Zackery House joins ESD as Group Leader of Technology Consulting Engineering

Zackery House joins ESD as Group Leader of Technology Consulting Engineering


By ESD | March 14, 2013
Zackery House
Zackery House

Zackery House has been named Vice President and Group Leader of Technology Consulting Engineering at ESD (Environmental Systems Design, Inc.), an international leader in the consulting-engineering design of high performance building systems.

In his new position, Mr. House will be responsible for strategic project and staffing decisions for ESD’s Technology Consulting Engineering Group. He is responsible for resource and project management assessments, strengthening marketplace awareness, and business development.

Prior to joining ESD, Mr. House was Director of Telecommunication Project Services at Wal-Mart Stores in Bentonville, Arkansas. In this position, he built a team of IT professionals who delivered global technology systems infrastructure aligned to business goals and service delivery.  He was responsible for the daily operations of a team of telecom project managers and registered communication distribution designers, and he drove telecom innovation across all Wal-Mart and Sam’s Club US Division formats.

Mr. House is a Certified Professional Project Leader, Registered Information Technology Project Manager (RITPM), Registered Telecommunications Project Manager (RTPM), BICSI Registered Communications Distribution Designer (RCDD), and Outside Plant Specialist (OSP).  He also has a Six Sigma White Belt Certification.  Mr. House received a Master of Science in Operations Management from the University of Arkansas’ College of Engineering and a Bachelor of Science in Business Management from Capella University.

ESD is a global consulting-engineering firm that focuses on the delivery of high-performance buildings.  The company delivers value by creating healthy and productive environments and designing facilities that are more cost effective, flexible, reliable, and sustainable. Utilizing an integrative design process, ESD’s engineering and design professionals (250+) apply innovative technologies such as energy modeling and BIM (Building Information Modeling) to address owners’ needs.  For more information, please visit: www.esdglobal.com.

Tags

Related Stories

| May 19, 2011

BD+C’s "40 Under 40" winners for 2011

The 40 individuals profiled here are some of the brightest stars in the AEC universe—and they’re under the age of 40. These young architects, engineers, contractors, designers, and developers stood out among a group of 164 outstanding entrants in our sixth annual “40 Under 40” competition.

| May 18, 2011

8 Tips for Designing Wood Trusses

Successful metal-plate-connected wood truss projects require careful attention to detail from Building Team members.

| May 18, 2011

Major Trends in University Residence Halls

They’re not ‘dorms’ anymore. Today’s collegiate housing facilities are lively, state-of-the-art, and green—and a growing sector for Building Teams to explore.

| May 18, 2011

Former Bronx railyard redeveloped as shared education campus

Four schools find strength in numbers at the new 2,310-student Mott Haven Campus in New York City. The schools—three high schools and a K-4 elementary school—coexist on the 6.5-acre South Bronx campus, which was once a railyard.

| May 18, 2011

Addition provides new school for pre-K and special-needs kids outside Chicago

Perkins+Will, Chicago, designed the Early Learning Center, a $9 million, 37,000-sf addition to Barrington Middle School in Barrington, Ill., to create an easily accessible and safe learning environment for pre-kindergarten and special-needs students.

| May 18, 2011

Raphael Viñoly’s serpentine-shaped building snakes up San Francisco hillside

The hillside location for the Ray and Dagmar Dolby Regeneration Medicine building at the University of California, San Francisco, presented a challenge to the Building Team of Raphael Viñoly, SmithGroup, DPR Construction, and Forell/Elsesser Engineers. The 660-foot-long serpentine-shaped building sits on a structural framework 40 to 70 feet off the ground to accommodate the hillside’s steep 60-degree slope.

| May 18, 2011

New center provides home to medical specialties

Construction has begun on the 150,000-sf Medical Arts Pavilion at the University Medical Center in Princeton, N.J.

| May 18, 2011

Improvements add to Detroit convention center’s appeal

Interior and exterior renovations and updates will make the Detroit Cobo Center more appealing to conventioneers. A new 40,000-sf ballroom will take advantage of the center’s riverfront location, with views of the river and downtown.

| May 18, 2011

One of Delaware’s largest high schools seeks LEED for Schools designation

The $82 million, 280,000-sf Dover (Del.) High School will have capacity for 1,800 students and feature a 900-seat theater, a 2,500-seat gymnasium, and a 5,000-seat football stadium.

boombox1
boombox2
native1

More In Category

Great Solutions

41 Great Solutions for architects, engineers, and contractors

AI ChatBots, ambient computing, floating MRIs, low-carbon cement, sunshine on demand, next-generation top-down construction. These and 35 other innovations make up our 2024 Great Solutions Report, which highlights fresh ideas and innovations from leading architecture, engineering, and construction firms.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021