flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Zackery House joins ESD as Group Leader of Technology Consulting Engineering

Zackery House joins ESD as Group Leader of Technology Consulting Engineering


By ESD | March 14, 2013
Zackery House
Zackery House

Zackery House has been named Vice President and Group Leader of Technology Consulting Engineering at ESD (Environmental Systems Design, Inc.), an international leader in the consulting-engineering design of high performance building systems.

In his new position, Mr. House will be responsible for strategic project and staffing decisions for ESD’s Technology Consulting Engineering Group. He is responsible for resource and project management assessments, strengthening marketplace awareness, and business development.

Prior to joining ESD, Mr. House was Director of Telecommunication Project Services at Wal-Mart Stores in Bentonville, Arkansas. In this position, he built a team of IT professionals who delivered global technology systems infrastructure aligned to business goals and service delivery.  He was responsible for the daily operations of a team of telecom project managers and registered communication distribution designers, and he drove telecom innovation across all Wal-Mart and Sam’s Club US Division formats.

Mr. House is a Certified Professional Project Leader, Registered Information Technology Project Manager (RITPM), Registered Telecommunications Project Manager (RTPM), BICSI Registered Communications Distribution Designer (RCDD), and Outside Plant Specialist (OSP).  He also has a Six Sigma White Belt Certification.  Mr. House received a Master of Science in Operations Management from the University of Arkansas’ College of Engineering and a Bachelor of Science in Business Management from Capella University.

ESD is a global consulting-engineering firm that focuses on the delivery of high-performance buildings.  The company delivers value by creating healthy and productive environments and designing facilities that are more cost effective, flexible, reliable, and sustainable. Utilizing an integrative design process, ESD’s engineering and design professionals (250+) apply innovative technologies such as energy modeling and BIM (Building Information Modeling) to address owners’ needs.  For more information, please visit: www.esdglobal.com.

Tags

Related Stories

Contractors | Apr 20, 2015

Too many construction projects don’t meet owners’ expectations: KPMG report

Causes for delays, overruns, and underperformance include project management talent shortages, distrust between owners and contractors, and the lack of fully integrated project management systems.     

High-rise Construction | Apr 17, 2015

Construction begins on Goettsch Partners-designed Nanning China Resources Center Tower

The tower's design is derived from its multiple uses, which include 170,000 sm of Class A office space, 5,000 sm of boutique retail, and a 45,000-sm luxury Shangri-La hotel.

High-rise Construction | Apr 16, 2015

Construction begins on Seattle's Tibet-inspired Potala Tower

Construction on the 41-story Potala Tower in Seattle finally kicked off following a ground-breaking ceremony seven months ago.

Building Team Awards | Apr 10, 2015

14 projects that push AEC teaming to the limits

From Lean construction to tri-party IPD to advanced BIM/VDC coordination, these 14 Building Teams demonstrate the power of collaboration in delivering award-winning buildings. These are the 2015 Building Team Award winners.

Building Team Awards | Apr 10, 2015

Prefab saves the day for Denver hospital

Mortenson Construction and its partners completed the 831,000-sf, $623 million Saint Joseph Hospital well before the January 1, 2015, deadline, thanks largely to their extensive use of offsite prefabrication.

Building Team Awards | Apr 10, 2015

Anaheim’s soaring intermodal hub

Anaheim's Regional Transportations Intermodal Center is the largest ETFE project in North America.

Building Team Awards | Apr 10, 2015

Virtual collaboration helps complete a hospital in 24 months

PinnacleHealth needed a new hospital STAT! This team delivered it in two years, start to finish.

Building Team Awards | Apr 10, 2015

New arts venue reinvigorates Virginia Tech's campus

The STV-led Building Team creates a world-class performance and arts venue with learning and entrepreneurial dimensions.

Building Team Awards | Apr 9, 2015

Multifaced fitness center becomes campus landmark

A sloped running track and open-concept design put this Building Team to the test. 

Building Team Awards | Apr 9, 2015

Nation's first LEED-certified bus depot

A bus garage in Harlem shows that even the most mundane of facilities can strut its environmentally sensitive stuff.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021