flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

The year’s boldest BIM/VDC themes

The year’s boldest BIM/VDC themes

High-speed rendering software, custom APIs, virtual reality tools, and BIM workflow tips were among the hottest BIM/VDC topics in 2014. 


By BD+C Staff | December 8, 2014
Photo: WorldViz
Photo: WorldViz

In today’s tech-driven AEC workplace environment, the only constant, it seems, is change. Firms are scrambling to keep up with the latest BIM/VDC-related tools and are searching for ways to more effectively implement and manage those tools on their projects. There’s a thirst for knowledge of all things BIM.

The following collection of feature stories, case studies, and Web-exclusive content is based on the number of BDCnetwork.com readers who clicked on the article during the past 11 months. For more BIM/VDC articles from BD+C, visit www.BDCnetwork.com/BIMit. 

 

1. “5 tech trends transforming BIM/VDC”

By Jeff Yoders, Contributing Editor, BD+C
As BIM/VDC continues to evolve the work processes of AEC firms, promising technologies are being applied to take 3D coordination to the next level. This report covers five breakthrough ideas: energy modeling on the fly, laser scanning, prefabrication of building systems, advanced data management, and computer-aided manufacturing. www.BDCnetwork.com/BIMtechtrends

 

2. “Hyper-speed rendering: How Gensler turns BIM models into beauty shots in seconds”

By David Barista, Editor-in-Chief, BD+C
The rise of BIM and 3D rendering technology has raised client expectations and placed additional pressure on Building Teams to produce visually striking artwork that accurately depicts the very latest iteration of a project’s design. Turnaround time on artwork has to be in hours, not days or weeks. In search of a fast rendering solution, Gensler looked to the gaming and moviemaking industries for the next breakthrough tool: Octane Render. www.BDCnetwork.com/Octane

 

3. “7 ways to cut waste in BIM implementation”

By David Barista, BD+C
More than two decades into the building information modeling movement, AEC firms are still discovering ways to utilize BIM/VDC tools more effectively. One major current area of focus is how to cut waste in the BIM implementation process. In this report, several BIM/VDC power users offer their top tips for eliminating waste in BIM/VDC workflows. www.BDCnetwork.com/BIMworkflow

 

4. “Firms enhance BIM/VDC with advanced collaboration tools”

By David Barista, BD+C
A special to the BD+C Giants 300 report, this article highlights BIM/VDC innovations by the nation’s largest AEC firms, including SOM, Stantec, and Thornton Tomasetti. Among the breakthrough ideas featured: cloud-based data sharing, rapid iterative design, and cross-discipline collaboration. www.BDCnetwork.com/BIMGiants2014

 

5. “Super BIM: 7 award-winning BIM/VDC-driven projects”

By AIA Technology in Architectural Practice Knowledge Community
Thom Mayne’s Perot Museum of Nature and Science in Dallas and the Anaheim (Calif.) Regional Transportation Intermodal Center were among the seven projects named 2014 AIA TAP BIM Award winners by the AIA’s Technology in Architectural Practice (TAP) Knowledge Community. This slideshow recaps the winning projects. www.BDCnetwork.com/SuperBIM 

 

6. “Perfecting prefab: 8 tips for healthcare construction projects”

By David Barista, BD+C
Healthcare projects across the U.S. are being built in record time, thanks, in part, to the implementation of advanced multi-trade prefabrication techniques. By assembling components like MEP infrastructure, headwalls, and bathrooms offsite in a controlled environment, Building Teams are able to compress project schedules by performing multiple construction activities in parallel. This report offers helpful advice for using BIM to pull off prefabrication. www.BDCnetwork.com/BIMprefab

 

7. “Total immersion: Has virtual reality’s time finally come?”

By David Barista, BD+C
Virtual reality technology is a natural fit for the AEC industry. Many firms are already building highly detailed BIM/VDC models of their most complex projects, so VR looks like the logical next step. But, as our experts reveal, pulling off VR is not so simple. www.BDCnetwork.com/VR2014

 

8. “5 ways virtual modeling can improve facilities management”

By Jennifer Macks, Vice President, Skanska USA
BIM has become standard practice for design and construction, but often little attention is paid to what happens to model data post-construction. This blog post details practical applications for BIM/VDC tools for the operation and maintenance of buildings, including space management, maintenance scheduling, and retrofit planning. www.BDCnetwork.com/BIMom

 

9. “How architects at NBBJ are using computational design to calculate the best views on projects”

By Andrew Heumann, Computational Design Specialist, NBBJ
In an ideal world, every employee would have a beautiful view from his or her desk. Using computational design, architects like NBBJ can help building owners, developers, and tenants maximize views from every angle and position within a tower. In this video, NBBJ’s Andrew Heumann demonstrates a custom computational design tool the firm is using to improve views on a Seattle high-rise project. www.BDCnetwork.com/BIMviews

Related Stories

| Sep 13, 2010

Richmond living/learning complex targets LEED Silver

The 162,000-sf living/learning complex includes a residence hall with 122 units for 459 students with a study center on the ground level and communal and study spaces on each of the residential levels. The project is targeting LEED Silver.

| Sep 13, 2010

World's busiest land port also to be its greenest

A larger, more efficient, and supergreen border crossing facility is planned for the San Ysidro (Calif.) Port of Entry to better handle the more than 100,000 people who cross the U.S.-Mexico border there each day.

| Sep 13, 2010

Triple-LEED for Engineering Firm's HQ

With more than 250 LEED projects in the works, Enermodal Engineering is Canada's most prolific green building consulting firm. In 2007, with the firm outgrowing its home office in Kitchener, Ont., the decision was made go all out with a new green building. The goal: triple Platinum for New Construction, Commercial Interiors, and Existing Buildings: O&M.

| Sep 13, 2010

Stadium Scores Big with Cowboys' Fans

Jerry Jones, controversial billionaire owner of the Dallas Cowboys, wanted the team's new stadium in Arlington, Texas, to really amp up the fan experience. The organization spent $1.2 billion building a massive three-million-sf arena that seats 80,000 (with room for another 20,000) and has more than 300 private suites, some at field level-a first for an NFL stadium.

| Sep 13, 2010

'A Model for the Entire Industry'

How a university and its Building Team forged a relationship with 'the toughest building authority in the country' to bring a replacement hospital in early and under budget.

| Sep 13, 2010

Committed to the Core

How a forward-looking city government, a growth-minded university, a developer with vision, and a determined Building Team are breathing life into downtown Phoenix.

| Sep 13, 2010

Conquering a Mountain of Construction Challenges

Brutal winter weather, shortages of materials, escalating costs, occasional visits from the local bear population-all these were joys this Building Team experienced working a new resort high up in the Sierra Nevada.

| Sep 13, 2010

Data Centers Keeping Energy, Security in Check

Power consumption for data centers doubled from 2000 and 2006, and it is anticipated to double again by 2011, making these mission-critical facilities the nation's largest commercial user of electric power. With major technology companies investing heavily in new data centers, it's no wonder Building Teams see these mission-critical facilities as a golden opportunity, and why they are working hard to keep energy costs at data centers in check.

| Sep 13, 2010

3D Prototyping Goes Low-cost

Today’s less costly 3D color printers are attracting the attention of AEC firms looking to rapidly prototype designs and communicate design intent to clients. 

| Aug 11, 2010

Cubellis principals reorganize as CI design

Former principals of Cubellis Inc. have formed ci design "with a stellar group of projects in the United States and internationally," states John Larsen who, with Richard Rankin and Christopher Ladd, is leading the architecture and planning firm.

boombox1
boombox2
native1

More In Category

Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021