flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

The year’s boldest BIM/VDC themes

The year’s boldest BIM/VDC themes

High-speed rendering software, custom APIs, virtual reality tools, and BIM workflow tips were among the hottest BIM/VDC topics in 2014. 


By BD+C Staff | December 8, 2014
Photo: WorldViz
Photo: WorldViz

In today’s tech-driven AEC workplace environment, the only constant, it seems, is change. Firms are scrambling to keep up with the latest BIM/VDC-related tools and are searching for ways to more effectively implement and manage those tools on their projects. There’s a thirst for knowledge of all things BIM.

The following collection of feature stories, case studies, and Web-exclusive content is based on the number of BDCnetwork.com readers who clicked on the article during the past 11 months. For more BIM/VDC articles from BD+C, visit www.BDCnetwork.com/BIMit. 

 

1. “5 tech trends transforming BIM/VDC”

By Jeff Yoders, Contributing Editor, BD+C
As BIM/VDC continues to evolve the work processes of AEC firms, promising technologies are being applied to take 3D coordination to the next level. This report covers five breakthrough ideas: energy modeling on the fly, laser scanning, prefabrication of building systems, advanced data management, and computer-aided manufacturing. www.BDCnetwork.com/BIMtechtrends

 

2. “Hyper-speed rendering: How Gensler turns BIM models into beauty shots in seconds”

By David Barista, Editor-in-Chief, BD+C
The rise of BIM and 3D rendering technology has raised client expectations and placed additional pressure on Building Teams to produce visually striking artwork that accurately depicts the very latest iteration of a project’s design. Turnaround time on artwork has to be in hours, not days or weeks. In search of a fast rendering solution, Gensler looked to the gaming and moviemaking industries for the next breakthrough tool: Octane Render. www.BDCnetwork.com/Octane

 

3. “7 ways to cut waste in BIM implementation”

By David Barista, BD+C
More than two decades into the building information modeling movement, AEC firms are still discovering ways to utilize BIM/VDC tools more effectively. One major current area of focus is how to cut waste in the BIM implementation process. In this report, several BIM/VDC power users offer their top tips for eliminating waste in BIM/VDC workflows. www.BDCnetwork.com/BIMworkflow

 

4. “Firms enhance BIM/VDC with advanced collaboration tools”

By David Barista, BD+C
A special to the BD+C Giants 300 report, this article highlights BIM/VDC innovations by the nation’s largest AEC firms, including SOM, Stantec, and Thornton Tomasetti. Among the breakthrough ideas featured: cloud-based data sharing, rapid iterative design, and cross-discipline collaboration. www.BDCnetwork.com/BIMGiants2014

 

5. “Super BIM: 7 award-winning BIM/VDC-driven projects”

By AIA Technology in Architectural Practice Knowledge Community
Thom Mayne’s Perot Museum of Nature and Science in Dallas and the Anaheim (Calif.) Regional Transportation Intermodal Center were among the seven projects named 2014 AIA TAP BIM Award winners by the AIA’s Technology in Architectural Practice (TAP) Knowledge Community. This slideshow recaps the winning projects. www.BDCnetwork.com/SuperBIM 

 

6. “Perfecting prefab: 8 tips for healthcare construction projects”

By David Barista, BD+C
Healthcare projects across the U.S. are being built in record time, thanks, in part, to the implementation of advanced multi-trade prefabrication techniques. By assembling components like MEP infrastructure, headwalls, and bathrooms offsite in a controlled environment, Building Teams are able to compress project schedules by performing multiple construction activities in parallel. This report offers helpful advice for using BIM to pull off prefabrication. www.BDCnetwork.com/BIMprefab

 

7. “Total immersion: Has virtual reality’s time finally come?”

By David Barista, BD+C
Virtual reality technology is a natural fit for the AEC industry. Many firms are already building highly detailed BIM/VDC models of their most complex projects, so VR looks like the logical next step. But, as our experts reveal, pulling off VR is not so simple. www.BDCnetwork.com/VR2014

 

8. “5 ways virtual modeling can improve facilities management”

By Jennifer Macks, Vice President, Skanska USA
BIM has become standard practice for design and construction, but often little attention is paid to what happens to model data post-construction. This blog post details practical applications for BIM/VDC tools for the operation and maintenance of buildings, including space management, maintenance scheduling, and retrofit planning. www.BDCnetwork.com/BIMom

 

9. “How architects at NBBJ are using computational design to calculate the best views on projects”

By Andrew Heumann, Computational Design Specialist, NBBJ
In an ideal world, every employee would have a beautiful view from his or her desk. Using computational design, architects like NBBJ can help building owners, developers, and tenants maximize views from every angle and position within a tower. In this video, NBBJ’s Andrew Heumann demonstrates a custom computational design tool the firm is using to improve views on a Seattle high-rise project. www.BDCnetwork.com/BIMviews

Related Stories

| Jan 19, 2011

Extended stay hotel aims to provide comfort of home

Housing development company Campus Apartments broke ground on a new extended stay hotel that will serve the medical and academic facilities in Philadelphia’s University City, including the University of Pennsylvania and the Children’s Hospital of Philadelphia. The 11,000-sf hotel will operate under Hilton’s Homewood Suites brand, with 136 suites with full kitchens and dining and work areas. A part of the city’s EnergyWorks loan program, the project aims for LEED with a green roof, low-flow fixtures, and onsite stormwater management. Local firms Alesker & Dundon Architects and GC L.F. Driscoll Co. complete the Building Team.

| Jan 19, 2011

New Fort Hood hospital will replace aging medical center

The Army Corps of Engineers selected London-based Balfour Beatty and St. Louis-based McCarthy to provide design-build services for the Fort Hood Replacement Hospital in Texas, a $503 million, 944,000-sf complex partially funded by the American Recovery and Reinvestment Act. The firm plans to use BIM for the project, which will include outpatient clinics, an ambulance garage, a central utility plant, and three parking structures. Texas firms HKS Architects and Wingler & Sharp will participate as design partners. The project seeks LEED Gold.

| Jan 19, 2011

Museum design integrates Greek history and architecture

Construction is under way in Chicago on the National Hellenic Museum, the nation’s first museum devoted to Greek history and culture. RTKL designed the 40,000-sf limestone and glass building to include such historic references as the covered walkway of classical architecture and the natural wood accents of Byzantine monasteries. The museum will include a research library and oral history center, plus a 3,600-sf rooftop terrace featuring three gardens. The project seeks LEED Silver.

| Jan 19, 2011

Architecture Billings Index jumped more than 2 points in December

On the heels of its highest mark since 2007, the Architecture Billings Index jumped more than two points in December. The American Institute of Architects reported the December ABI score was 54.2, up from a reading of 52.0 the previous month. 

| Jan 19, 2011

Large-Scale Concrete Reconstruction Solid Thinking

Driven by both current economic conditions and sustainable building trends, Building Teams are looking more and more to retrofits and reconstruction as the most viable alternative to new construction. In that context, large-scale concrete restoration projects are playing an important role within this growing specialty.

| Jan 10, 2011

Architect Jean Nouvel designs an island near Paris

Abandoned by carmaker Renault almost 20 years ago, Seguin Island in Boulogne-Billancourt, France, is being renewed by architect Jean Nouvel. Plans for the 300,000-square-meter project includes a mix of culture, commerce, urban parks, and gardens, which officials hope will attract both Parisians and tourists.

| Jan 10, 2011

Michael J. Alter, president of The Alter Group: ‘There’s a significant pent-up demand for projects’

Michael J. Alter, president of The Alter Group, a national corporate real estate development firm headquartered in Skokie, Ill., on the growth of urban centers, project financing, and what clients are saying about sustainability.

| Jan 7, 2011

BIM on Target

By using BIM for the design of its new San Clemente, Calif., store, big-box retailer Target has been able to model the entire structural steel package, including joists, in 3D, chopping the timeline for shop drawings from as much as 10 weeks down to an ‘unheard of’ three-and-a-half weeks.

| Jan 7, 2011

How Building Teams Choose Roofing Systems

A roofing survey emailed to a representative sample of BD+C’s subscriber list revealed such key findings as: Respondents named metal (56%) and EPDM (50%) as the roofing systems they (or their firms) employed most in projects. Also, new construction and retrofits were fairly evenly split among respondents’ roofing-related projects over the last couple of years.

boombox1
boombox2
native1

More In Category


Urban Planning

The magic of L.A.’s Melrose Mile

Great streets are generally not initially curated or willed into being. Rather, they emerge organically from unintentional synergies of commercial, business, cultural and economic drivers. L.A.’s Melrose Avenue is a prime example. 


Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 


halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021