WSP | Parsons Brinckerhoff, a global engineering and professional services organization, has acquired Halvorson and Partners, a 40-person Chicago-based firm that provides structural engineering services for developers, private owners, and institutions worldwide.
Formed in 1996, Halvorson and Partners has completed structural designs for high-profile projects throughout the world. Its portfolio includes the Burj Mohammed Bin Rashid Tower in Abu Dhabi, which won the 2015 Best Tall Building Award for the Middle East and Africa from the CTBUH. Other prominent recent projects include: OneEleven, a 60-story luxury apartment tower in Chicago; Wolf Point West Tower, the first tower in a multi-phase $1 billion (USD) development along the Chicago River in Chicago; and Vantone Tower, a 600-foot-tall corporate headquarters in Tianjin, China.
Robert Halvorson, founding principal of Halvorson and Partners, led the firm’s designs for the recently completed Index Building in Dubai and the Central Market Towers in Abu Dhabi. He also developed the structural concepts for a number of super-tall towers which Halvorson and Partners has taken through schematic design and design development, including 1 Dubai, Russia Tower in Moscow, and Hanking Center in Shenzhen. Halvorson will remain with the firm and has been named an executive vice president, where he will continue to lead the Chicago office.
Aside from structural engineering services for tall and complex buildings, Halvorson and Partners offers technical expertise in such areas as adaptive reuse/tenant modification, forensic engineering, value engineering, building assessment, and peer review. Its clients include owners and developers of commercial office towers, residential buildings, hotels, and mixed-use complexes as well as educational and civic institutions.
Related Stories
| Feb 22, 2011
LEED Volume Program celebrates its 500th certified Pilot Project
More than 500 building projects have certified through the LEED Volume Program since the pilot launched in 2006, according to the U.S. Green Building Council. The LEED Volume Program streamlines the certification process for high-volume property owners and managers, from commercial real estate firms, national retailers and hospitality providers, to local, state and federal governments.
| Feb 14, 2011
Sustainable Roofing: A Whole-Building Approach
According to sustainability experts, the first step toward designing an energy-efficient roofing system is to see roof materials and systems as an integral component of the enclosure and the building as a whole. Earn 1.0 AIA/CES learning units by studying this article and successfully completing the online exam.
| Feb 11, 2011
Four Products That Stand Up to Hurricanes
What do a panelized wall system, a newly developed roof hatch, spray polyurethane foam, and a custom-made curtain wall have in common? They’ve been extensively researched and tested for their ability to take abuse from the likes of Hurricane Katrina.
| Feb 11, 2011
RS Means Cost Comparison Chart: Office Buildings
This month's RS Means Cost Comparison Chart focuses on office building construction.
| Feb 11, 2011
Sustainable features on the bill for dual-building performing arts center at Soka University of America
The $73 million Soka University of America’s new performing arts center and academic complex recently opened on the school’s Aliso Viejo, Calif., campus. McCarthy Building Companies and Zimmer Gunsul Frasca Architects collaborated on the two-building project. One is a three-story, 47,836-sf facility with a grand reception lobby, a 1,200-seat auditorium, and supports spaces. The other is a four-story, 48,974-sf facility with 11 classrooms, 29 faculty offices, a 150-seat black box theater, rehearsal/dance studio, and support spaces. The project, which has a green roof, solar panels, operable windows, and sun-shading devices, is going for LEED Silver.
| Feb 11, 2011
BIM-enabled Texas church complex can broadcast services in high-def
After two years of design and construction, members of the Gateway Church in Southland, Texas, were able to attend services in their new 4,000-seat facility in late 2010. Located on a 180-acre site, the 205,000-sf complex has six auditoriums, including a massive 200,000-sf Worship Center, complete with catwalks, top-end audio and video system, and high-definition broadcast capabilities. BIM played a significant role in the building’s design and construction. Balfour Beatty Construction and Beck Architecture formed the nucleus of the Building Team.
| Feb 11, 2011
Kentucky’s first green adaptive reuse project earns Platinum
(FER) studio, Inglewood, Calif., converted a 115-year-old former dry goods store in Louisville, Ky., into a 10,175-sf mixed-use commercial building earned LEED Platinum and holds the distinction of being the state’s first adaptive reuse project to earn any LEED rating. The facility, located in the East Market District, houses a gallery, event space, offices, conference space, and a restaurant. Sustainable elements that helped the building reach its top LEED rating include xeriscaping, a green roof, rainwater collection and reuse, 12 geothermal wells, 81 solar panels, a 1,100-gallon ice storage system (off-grid energy efficiency is 68%) and the reuse and recycling of construction materials. Local firm Peters Construction served as GC.