flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

WSP to acquire Parsons Brinckerhoff in $1.35 billion deal

WSP to acquire Parsons Brinckerhoff in $1.35 billion deal

Acquisition would create a 31,000-person firm; Balfour Beatty stockholders and antitrust regulators must still give the go-ahead


By BD+C Staff | September 3, 2014
The consolidation would strengthen WSP's position in the U.S. transportation seg
The consolidation would strengthen WSP's position in the U.S. transportation segment and in the United Kingdom, where Parsons Br

Giant design/engineering firm WSP Global said today it plans to acquire infrastructure professional services firm Parsons Brinckerhoff from PB's parent organization, Balfour Beatty plc. The deal, which has been approved by the boards of WSP and Balfour Beatty, has an enterprise value of $1.243 billion, plus another $110 million in cash retained by PB.

The acquisition, if approved by Balfour Beatty shareholders and cleared by antitrust regulators, would create a mega-firm of more than 30,000 employees - 17,500 from Montreal-based WSP, 13,500 from New York-based Parsons Brinckerhoff. WSP currently has >300 offices in 30 countries on 5 continents; PB has 170 offices worldwide, with about 5,000 employees in the U.S.

The consolidation would strengthen WSP's position in the U.S. transportation segment and in the United Kingdom, where Parsons Brinckerhoff is a strong player. WSP said in a release that the move would also give the firm "a stronger presence in key growth regions such as Asia and Australia."

Parsons Brinckerhoff was founded in 1885. It is known for its expertise in infrastructure services in water, mining, power, transportation, energy, community development, and environment.

WSP, which acquired Flack & Kurtz in 2012, is considered a major player in urban planning and environmental projects, and in the engineering of complex buildings.

Related Stories

| Nov 1, 2010

John Pearce: First thing I tell designers: Do your homework!

John Pearce, FAIA, University Architect at Duke University, Durham, N.C., tells BD+C’s Robert Cassidy  about the school’s construction plans and sustainability efforts, how to land work at Duke, and why he’s proceeding with caution when it comes to BIM.

| Nov 1, 2010

Vancouver’s former Olympic Village shoots for Gold

The first tenants of the Millennium Water development in Vancouver, B.C., were Olympic athletes competing in the 2010 Winter Games. Now the former Olympic Village, located on a 17-acre brownfield site, is being transformed into a residential neighborhood targeting LEED ND Gold. The buildings are expected to consume 30-70% less energy than comparable structures.

| Oct 27, 2010

Grid-neutral education complex to serve students, community

MVE Institutional designed the Downtown Educational Complex in Oakland, Calif., to serve as an educational facility, community center, and grid-neutral green building. The 123,000-sf complex, now under construction on a 5.5-acre site in the city’s Lake Merritt neighborhood, will be built in two phases, the first expected to be completed in spring 2012 and the second in fall 2014.

| Oct 21, 2010

GSA confirms new LEED Gold requirement

The General Services Administration has increased its sustainability requirements and now mandates LEED Gold for its projects.

| Oct 18, 2010

World’s first zero-carbon city on track in Abu Dhabi

Masdar City, the world’s only zero-carbon city, is on track to be built in Abu Dhabi, with completion expected as early as 2020. Foster + Partners developed the $22 billion city’s master plan, with Adrian Smith + Gordon Gill Architecture, Aedas, and Lava Architects designing buildings for the project’s first phase, which is on track to be ready for occupancy by 2015.

| Oct 13, 2010

Editorial

The AEC industry shares a widespread obsession with the new. New is fresh. New is youthful. New is cool. But “old” or “slightly used” can be financially profitable and professionally rewarding, too.

| Oct 13, 2010

Test run on the HP Z200 SFF Good Value in a Small Package

Contributing Editor Jeff Yoders tests a new small-form factor, workstation-class desktop in Hewlett-Packard’s line that combines performance of its minitower machine with a smaller chassis and a lower price.

| Oct 13, 2010

Prefab Trailblazer

The $137 million, 12-story, 500,000-sf Miami Valley Hospital cardiac center, Dayton, Ohio, is the first major hospital project in the U.S. to have made extensive use of prefabricated components in its design and construction.

| Oct 13, 2010

Thought Leader

Sundra L. Ryce, President and CEO of SLR Contracting & Service Company, Buffalo, N.Y., talks about her firm’s success in new construction, renovation, CM, and design-build projects for the Navy, Air Force, and Buffalo Public Schools.

boombox1
boombox2
native1

More In Category


Healthcare Facilities

Watch on-demand: Key Trends in the Healthcare Facilities Market for 2024-2025

Join the Building Design+Construction editorial team for this on-demand webinar on key trends, innovations, and opportunities in the $65 billion U.S. healthcare buildings market. A panel of healthcare design and construction experts present their latest projects, trends, innovations, opportunities, and data/research on key healthcare facilities sub-sectors. A 2024-2025 U.S. healthcare facilities market outlook is also presented.



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021