flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

World’s first TRUE-certified building project completed in California

Sustainability

World’s first TRUE-certified building project completed in California

The new laboratory and office campus construction achieved a 98% waste diversion rate.


By Peter Fabris, Contributing Editor | March 21, 2024
Genesis Marina exterior photo by Regent Pictures
Genesis Marina exterior photo by Regent Pictures

GENESIS Marina, an expansive laboratory and office campus in Brisbane, Calif., is the world’s first Total Resource Use and Efficiency (TRUE)-certified construction endeavor. The recently completed project consisted of three buildings totaling about 560,000 sf.  

The certification recognizes projects that achieve outstanding levels of resource efficiency through waste reduction, reuse, and recycling practices. The project diverted 98.4% of construction waste from landfills, an achievement that includes preventing waste from being sent to waste-to-energy facilities. 

TRUE certification is administered by Green Business Certification Inc. (GBCI), part of the US Green Building Council (USGBC) family. Construction manager Webcor partnered with All About Waste, a zero waste and circular economy consultant, to achieve the certification.

The certification process involved a comprehensive evaluation of waste reduction practices including reduced packaging, the use of recycled products, and innovative end-of-life solutions for materials. Webcor’s approach emphasized collaboration across all levels of the project team and with subcontractors and partners to achieve the project’s waste reduction goals.

Photo provided by Webcor (pictured: Webcor Construction Manager John Tuttle)
Pictured: Webcor Construction Manager John Tuttle. Photo courtesy Webcar

"TRUE emphasizes waste reduction before any waste is created on the jobsite,” says Webcor Sustainability Director Sarah Rege. “This significantly reduces the volume of waste and emissions from transportation, benefiting local air quality and supporting local businesses.”

GENESIS Marina was awarded TRUE Gold in February 2024.

“We are proud to see Webcor’s forward-thinking efforts at GENESIS Marina and for initiating a broader conversation about the feasibility and benefits of zero waste and sustainability in construction,” said Joe Marconi, a Partner at Bain Capital Real Estate. “We are committed to continuing these impactful practices and positively contributing to the built environment in the years to come.”

Owner and/or developer: Phase 3 Real Estate
Architect: Skidmore, Owings, & Merrill (SOM)
MEP engineer: Meyers+ Engineers
Structural engineer: Paradigm Structural Engineers
General contractor/construction manager: Webcor

Photo provided by Webcor
Photo courtesy Webcor

Related Stories

| Oct 7, 2011

GREENBUILD 2011: UL Environment releases industry-wide sustainability requirements for doors

  ASSA ABLOY Trio-E door is the first to be certified to these sustainability requirements.

| Oct 7, 2011

GREENBUILD 2011: UL Environment clarifies emerging environmental product declaration field

  White paper defines EPD, details development process, and identifies emerging trends for manufacturers, architects, designers, and buyers.

| Oct 5, 2011

GREENBUILD 2011: Roof hatch designed for energy efficiency

The cover features a specially designed EPDM finger-type gasket that ensures a positive seal with the curb to reduce air permeability and ensure energy performance. 

| Sep 28, 2011

GBCI announces LEED fellow class of 2011

  LEED Fellows represent green building industry's most accomplished professionals.

| Sep 14, 2011

Empire State Building achieves LEED Gold ?

The 2.85 million-sf building is celebrating its 80th anniversary while nearing completion of its renewal and repurposing to meet the needs of 21st Century businesses.

| Sep 12, 2011

Construction waste management

Best practices for an environmentally optimized job site.

| May 25, 2011

Low Impact Development: Managing Stormwater Runoff

Earn 1.0 AIA/CES HSW/SD learning units by studying this article and successfully passing the online exam.

| May 25, 2011

Smithsonian building $45 million green lab

Thanks to a $45 million federal appropriation to the Smithsonian Institution, the Smithsonian Environmental Research Center in Edgewater, Md., has broken ground on what is expected to be one of the most energy-efficient laboratories in the country. The 69,000-sf lab is targeting LEED Gold and is expected to use 37% less energy and emit 37% less carbon dioxide than a similar building.

| May 20, 2011

Chicago leads the nation in LEED-certified square footage

The U.S. Green Building Council reports that Chicago has the highest number of square feet of LEED-certified green building projects nationally with 71 million square feet.  

boombox1
boombox2
native1

More In Category


Sustainability

Grimshaw launches free online tool to help accelerate decarbonization of buildings

Minoro, an online platform to help accelerate the decarbonization of buildings, was recently launched by architecture firm Grimshaw, in collaboration with more than 20 supporting organizations including World Business Council for Sustainable Development (WBCSD), RIBA, Architecture 2030, the World Green Building Council (WorldGBC) and several national Green Building Councils from across the globe.


Green

Global green building alliance releases guide for $35 trillion investment to achieve net zero, meet global energy transition goals

The international alliance of UK-based Building Research Establishment (BRE), the Green Building Council of Australia (GBCA), the Singapore Green Building Council (SGBC), the U.S. Green Building Council (USGBC), and the Alliance HQE-GBC France developed the guide, Financing Transformation: A Guide to Green Building for Green Bonds and Green Loans, to strengthen global cooperation between the finance and real estate sectors.


halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021