GENESIS Marina, an expansive laboratory and office campus in Brisbane, Calif., is the world’s first Total Resource Use and Efficiency (TRUE)-certified construction endeavor. The recently completed project consisted of three buildings totaling about 560,000 sf.
The certification recognizes projects that achieve outstanding levels of resource efficiency through waste reduction, reuse, and recycling practices. The project diverted 98.4% of construction waste from landfills, an achievement that includes preventing waste from being sent to waste-to-energy facilities.
TRUE certification is administered by Green Business Certification Inc. (GBCI), part of the US Green Building Council (USGBC) family. Construction manager Webcor partnered with All About Waste, a zero waste and circular economy consultant, to achieve the certification.
The certification process involved a comprehensive evaluation of waste reduction practices including reduced packaging, the use of recycled products, and innovative end-of-life solutions for materials. Webcor’s approach emphasized collaboration across all levels of the project team and with subcontractors and partners to achieve the project’s waste reduction goals.
![Photo provided by Webcor (pictured: Webcor Construction Manager John Tuttle)](/sites/default/files/inline-images/webcor%202.jpeg)
"TRUE emphasizes waste reduction before any waste is created on the jobsite,” says Webcor Sustainability Director Sarah Rege. “This significantly reduces the volume of waste and emissions from transportation, benefiting local air quality and supporting local businesses.”
GENESIS Marina was awarded TRUE Gold in February 2024.
“We are proud to see Webcor’s forward-thinking efforts at GENESIS Marina and for initiating a broader conversation about the feasibility and benefits of zero waste and sustainability in construction,” said Joe Marconi, a Partner at Bain Capital Real Estate. “We are committed to continuing these impactful practices and positively contributing to the built environment in the years to come.”
Owner and/or developer: Phase 3 Real Estate
Architect: Skidmore, Owings, & Merrill (SOM)
MEP engineer: Meyers+ Engineers
Structural engineer: Paradigm Structural Engineers
General contractor/construction manager: Webcor
![Photo provided by Webcor](/sites/default/files/inline-images/webcor%203.jpeg)
Related Stories
Sustainability | Apr 20, 2017
The American Institute of Architects select the 2017 COTE Top Ten Awards
In its 21st year, the Top Ten Awards highlight projects that exemplify the integration of great design and great performance.
Sustainability | Apr 19, 2017
Embracing the WELL Building Standard: The next step in green
When you consider that 90% of our time is spent in buildings, how these environments can contribute to workplace productivity, health, and wellness is the logical next step in the smart building movement.
Sports and Recreational Facilities | Apr 19, 2017
Mercedes-Benz Stadium delayed until late August
The stadium is now scheduled to open on Aug. 26 in a preseason game between the Falcons and the Jaguars.
Multifamily Housing | Apr 18, 2017
Hanging Gardens-inspired CLT residential development proposed for Birmingham
Garden Hill will provide an ‘oasis-like residence’ for Birmingham’s growing, multicultural student population.
Green | Apr 14, 2017
Sunqiao looks to bring agriculture back to Shanghai’s urban landscape
Vertical farms will bring new farmable space to the city.
Sustainability | Apr 13, 2017
How to make a concrete bunker livable
SOM’s design for New York’s second Public Safety Answering Center leans on strategically placed windows and the outdoor environment.
Green | Apr 11, 2017
Passivhaus for high-rises? Research demonstrates viability of the stringent standards for tall residential buildings
A new study conducted by FXFOWLE shows that Building Teams can meet stringent Passivhaus performance standards with minimal impact to first cost and aesthetics.
Codes and Standards | Apr 6, 2017
Product-specific EPDs seen as key aid to earning green building credits
The product-specific EPDs allow designers to more quickly earn a LEED v4 credit in the Materials & Resources category.
Sustainability | Apr 4, 2017
Six connected CLT towers create an urban forest in India
The mixed-use towers would each rise 36 stories into the sky and connect via rooftop skybridges.
Urban Planning | Apr 3, 2017
Capturing the waterfront draw
People seem to experience a gravitation toward the water’s edge acutely and we traverse concrete and asphalt just to gaze out over an open expanse or to dip our toes in the blue stuff.