As more customers begin to order food through online channels, a new KFC pilot project in Newcastle, Australia looks to create a more efficient operating model to keep up with this change in consumer behavior.
Designed by FRCH NELSON with KFC SOPAC, the drive-thru only KFC features five lanes, two set up for traditional on-the-spot drive-thru orders, and three that allow customers to order and pay for a meal through the brand’s app or website. For online orders, customers drive up to one of the designated lanes and enter a four-digit code generated by the app on a touchscreen. Once the code is entered, the online order is sent to the kitchen where it is freshly prepared.
The goal of the design was to create a holistic drive-thru experience that leverages architecture, communication, service, and landscape. Without having the benefit of a public-facing interior, FRCH NELSON had to find other opportunities to display and celebrate the KFC brand on the building’s exterior, which leverages natural materials in conjunction with steel and glazing.
See Also: ‘The Whale’ will be an arctic attraction 185 miles north of the Arctic Circle
A large halo-lit Colonel Sanders layered atop the building’s wood-clad walls greets guests and the drive thru portal uses bold architecture to create a beacon for the experience. “With traditional restaurants, the building is the experience, but with this new concept it became a fixture – one element supporting the overall experience,” said Marty McCauley, Design Director at FRCH NELSON, in a release. “We had to utilize every exterior touchpoint from the landscaping, to the signage, to the architecture of the drive-thru portal, to create a holistic experience for guests.”
Related Stories
| May 5, 2014
8 modern trends in student dining
Creating a dining experience for the modern millennial requires not only a deep knowledge of good design, but also an understanding of what makes today’s students tick. Culinary designers and consultants provide insights into what trends are transforming the campus table.
| Apr 30, 2014
Visiting Beijing's massive Chaoyang Park Plaza will be like 'moving through a urban forest'
Construction work has begun on the 120,000-sm mixed-use development, which was envisioned by MAD architects as a modern, urban forest.
| Apr 29, 2014
Best of Canada: 12 projects nab nation's top architectural prize [slideshow]
The conversion of a Mies van der Rohe-designed gas station and North Vancouver City Hall are among the recently completed projects to win the 2014 Governor General's Medal in Architecture.
| Apr 29, 2014
USGBC launches real-time green building data dashboard
The online data visualization resource highlights green building data for each state and Washington, D.C.
| Apr 11, 2014
First look: KPF's designs for DreamWorks in the massive Shanghai DreamCenter
Two blocks of offices will be centerpiece of new cultural and lifestyle district in the West Bund Media Port.
| Apr 9, 2014
Steel decks: 11 tips for their proper use | BD+C
Building Teams have been using steel decks with proven success for 75 years. Building Design+Construction consulted with technical experts from the Steel Deck Institute and the deck manufacturing industry for their advice on how best to use steel decking.
| Apr 8, 2014
Gehry, Foster unveil plans for Battersea Power Station redevelopment [slideshow]
Phase 3 of the massive redevelopment of the London landmark will include more than 1,300 residential units, a 160-room hotel, and 350,000 sf of retail space.
| Apr 2, 2014
8 tips for avoiding thermal bridges in window applications
Aligning thermal breaks and applying air barriers are among the top design and installation tricks recommended by building enclosure experts.
| Mar 26, 2014
Callison launches sustainable design tool with 84 proven strategies
Hybrid ventilation, nighttime cooling, and fuel cell technology are among the dozens of sustainable design techniques profiled by Callison on its new website, Matrix.Callison.com.
| Mar 20, 2014
Common EIFS failures, and how to prevent them
Poor workmanship, impact damage, building movement, and incompatible or unsound substrate are among the major culprits of EIFS problems.