A larger, more efficient, and supergreen border crossing facility is planned for the San Ysidro (Calif.) Port of Entry to better handle the more than 100,000 people who cross the U.S.-Mexico border there each day. The land port operates 24/7 and is the busiest in the world, with an average 90-minute wait time for pedestrians and automobiles. Plans from The Miller Hull Partnership aim to reduce wait times to 30 minutes, with 34 lanes of traffic, each with two stacked inspection booths, and a 110,000-sf vehicle inspection canopy for primary and secondary vehicle inspection. Four masts will rise above the canopy to serve as both aesthetic and functional elements; they'll hold security cameras and lighting as well as pump fresh air into inspection booths below the canopy. The $395 million facility will also have a 200,000-sf administration and operations facility, ancillary buildings for the Department of Homeland Security, a 400-car parking garage, and a connection to Mexico's planned El Chaparral Land Port of Entry. The three-phase project is targeting LEED Platinum and net zero energy with several water conservation strategies (including a 700,000-gallon rainwater reclamation system) that are expected to save 12 million gallons per year and achieve water neutrality, a closed-loop geo-exchange system, a photovoltaic panel array, radiant heating and cooling panels, and native plantings.
Related Stories
| Nov 2, 2011
Alexandria Real Estate Equities, Inc. breaks ground on Alexandria Center in Cambridge, Mass.
307,000-sf building to be house to executive offices of Biogen Idec.
| Nov 2, 2011
CRSI’s Manual of Standard Practice now available
This resource contains information on recommended industry practices for estimating, detailing, fabricating, and placing reinforcing steel for reinforced concrete construction.
| Nov 2, 2011
John W. Baumgarten Architect, P.C, wins AIA Long Island Chapter‘s Healthcare Award for Renovation
The two-story lobby features inlaid marble floors and wood-paneled wainscoting that pays homage to the building’s history.
| Nov 2, 2011
Jacobs announces acquisition of KlingStubbins
Jacobs Engineering Group Inc. announced that it has acquired KlingStubbins. Officials did not disclose the terms of the agreement. Jacobs' acquisition of KlingStubbins, which has approximately 500 employees located in the United States and Asia, particularly enhances the Company's capabilities in design. KlingStubbins provides professional services in planning, architecture, engineering and interiors.
| Nov 1, 2011
Perkins Eastman opens office in San Francisco
Located at 23 Geary Street in the One Kearny building, the 8,100 sf office will accommodate a growing staff of 45.
| Nov 1, 2011
Sasaki expands national sports design studio
Sasaki has also added Stephen Sefton to the sports design studio as senior associate.
| Nov 1, 2011
Holcim awards winners for North America announced
A socio-architectural project to create regional food-gathering nodes and a logistics network in Canada's high arctic territory won the top prize for North America of $100,000.
| Oct 27, 2011
iProspect selects VLK Architects for new office design
Company growth prompted iProspect to make the decision to move to a new space.
| Oct 27, 2011
ASSA Abloy, MAXXESS Systems announce U.S. Aperio integration
Aperio will integrate with MAXXESS's eAXxess and Efusion Event Management Software packages.