flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

World's best new skyscrapers [slideshow]

World's best new skyscrapers [slideshow]

The Bow in Calgary and CCTV Headquarters in Beijing are among the world's best new high-rise projects, according to the Council on Tall Buildings and Urban Habitat. 


By BD+C Staff | July 10, 2013
A jury of high-rise design and construction professionals has selected four regional winners in the Council on Tall Buildings and Urban Habitat's 2013 Best Tall Building Awards, which honor the world's best new skyscrapers each year. One of the four projects will be named “Best Tall Building Worldwide” at the CTBUH 12th Annual Awards Ceremony and Dinner, November 7 in Chicago.
 
The four regional winners are: The Bow in Calgary, Canada (Americas); CCTV in Beijing, China (Asia and Australia); The Shard in London, United Kingdom (Europe); and Sowwah Square in Abu Dhabi, United Arab Emirates (Middle East and Africa). The winners were selected from a pool of 60-plus entries.
 
“The winners and finalists include some of the most striking buildings on the global landscape,” said Jeanne Gang, awards jury chair and Principal of Studio Gang Architects. “They represent resolutions to a huge range of contemporary issues, from energy consumption to integration with the urban realm on the ground.”
 
Here's a look at the four regional winners (images and descriptions courtesy CTBUH):
 
 

The Bow

 

 
 
Location: Calgary
Height: 779 feet; 58 stories
Function: Office
Completed: 2012
 
Building Team
Owner/Developer: H+R Reit
Design Architect: Foster + Partners
Associate Architect: Zeidler Partnership Architects
Structural Engineer: Halcrow Yolles
MEP Engineer: Cosentini
Project Manager: Matthews Southwest Canada
Main Contractor: Ledcor Construction Ltd.
Other Consultants: RWDI; Otis Elevator Company
 
 
 
 

 

 

 

CCTV Headquarters

 

 
Location: Beijing
Height: 768 feet; 54 stories
Function: Office
Completed: 2012
 
Building Team
Owner: China Central Television
Developer: General Office of CCTV New Site Construction & Development Program
Design Architect: Office for Metropolitan Architecture
Associate Architect: ECADI
Structural Engineers: Ove Arup & Partners; East China Architectural Design and Research
MEP Engineer: Ove Arup & Partners
Project Manager: Office for Metropolitan Architecture
Main Contractor: China State Construction
Other Consultants: RWDI
 
 
 
 
 
 

[pagebreak]

Al Khatem Tower

 

 
Location: Abu Dhabi
Height: 509 feet
Function: Office
Completed: 2012
 
Building Team
Owner/Developer: Mubadala Real Estate & Infrastructure
Design Architect: Goettsch Partners
Structural Engineer: Oger International
MEP Engineer: Oger International
Project Manager: Mubadala Real Estate & Infrastructure
Main Contractor: Oger Abu Dhabi
 
 
 
 
 
 

The Shard

 

 
Location: London
Height: 1004 feet
Function: Mixed use (residential, office, hotel)
Completed: 2013
 
Building Team
Owner: London Bridge Quarter Ltd
Developer: Sellar Property Group
Design Architect: Renzo Piano Building Workshop
Associate Architect: Adamson Associates
Structural Engineer: WSP Group
MEP Engineer: Arup
Project Manager: Turner & Townsend
Main Contractor: Mace
Material Suppliers: Permasteelisa Group
Other Consultants: RWDI, KONE, Dow Corning Corporation, AECOM
 
 
 

Related Stories

| Mar 16, 2012

Work on Oxnard, Calif. shopping center resumes after a three-year hiatus

Stalled since 2009, developers of the Collection at RiverPark decided to restart construction on the outdoor mall. 

| Mar 16, 2012

Stego embarks on HPD Pilot Program

Vapor barrier manufacturer strives to provide better green choices to designers and builders.

| Mar 16, 2012

Marvin Windows and Doors accepting entries for fourth-annual myMarvin Architect’s Challenge

Architects in U.S. and abroad offered the chance to showcase their very best work.

| Mar 14, 2012

Hearing to decide fate of unfinished Harmon in Las Vegas under way

The testimony began with CityCenter consulting engineer Chukwuma Ekwueme methodically showing photo after photo of parts of the Harmon, where he and his team had chipped away the concrete pillars and beams to examine the steel reinforcing bars inside.

| Mar 14, 2012

Firestone names 2012 Master Contractor Award Winners

Annual award acknowledges industry’s top roofing professionals.

| Mar 14, 2012

Plans for San Francisco's tallest building revamped

The glassy white high-rise would be 60 stories and 1,070 feet tall with an entrance at First and Mission streets.

| Mar 13, 2012

China's high-speed building boom

A 30-story hotel in Changsha went up in two weeks. Some question the safety in that, but the builder defends its methods.

| Mar 13, 2012

Commercial glazer Harmon expanding into Texas

Company expanding into the Texas market with a new office in Dallas and a satellite facility in Austin.

| Mar 13, 2012

Worker office space to drop below 100-sf in five years

The average for all companies for square feet per worker in 2017 will be 151 sf, compared to 176 sf, and 225 sf in 2010.

| Mar 7, 2012

Firestone iPad app offers touch technology

Free app provides a preview of Firestone’s Roots to Rooftop Building Envelope Solution with an overview of all the products from ground and stormwater management solutions, to complete wall panel and commercial roofing system applications.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021