flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

World's best new skyscrapers [slideshow]

World's best new skyscrapers [slideshow]

The Bow in Calgary and CCTV Headquarters in Beijing are among the world's best new high-rise projects, according to the Council on Tall Buildings and Urban Habitat. 


By BD+C Staff | July 10, 2013
A jury of high-rise design and construction professionals has selected four regional winners in the Council on Tall Buildings and Urban Habitat's 2013 Best Tall Building Awards, which honor the world's best new skyscrapers each year. One of the four projects will be named “Best Tall Building Worldwide” at the CTBUH 12th Annual Awards Ceremony and Dinner, November 7 in Chicago.
 
The four regional winners are: The Bow in Calgary, Canada (Americas); CCTV in Beijing, China (Asia and Australia); The Shard in London, United Kingdom (Europe); and Sowwah Square in Abu Dhabi, United Arab Emirates (Middle East and Africa). The winners were selected from a pool of 60-plus entries.
 
“The winners and finalists include some of the most striking buildings on the global landscape,” said Jeanne Gang, awards jury chair and Principal of Studio Gang Architects. “They represent resolutions to a huge range of contemporary issues, from energy consumption to integration with the urban realm on the ground.”
 
Here's a look at the four regional winners (images and descriptions courtesy CTBUH):
 
 

The Bow

 

 
 
Location: Calgary
Height: 779 feet; 58 stories
Function: Office
Completed: 2012
 
Building Team
Owner/Developer: H+R Reit
Design Architect: Foster + Partners
Associate Architect: Zeidler Partnership Architects
Structural Engineer: Halcrow Yolles
MEP Engineer: Cosentini
Project Manager: Matthews Southwest Canada
Main Contractor: Ledcor Construction Ltd.
Other Consultants: RWDI; Otis Elevator Company
 
 
 
 

 

 

 

CCTV Headquarters

 

 
Location: Beijing
Height: 768 feet; 54 stories
Function: Office
Completed: 2012
 
Building Team
Owner: China Central Television
Developer: General Office of CCTV New Site Construction & Development Program
Design Architect: Office for Metropolitan Architecture
Associate Architect: ECADI
Structural Engineers: Ove Arup & Partners; East China Architectural Design and Research
MEP Engineer: Ove Arup & Partners
Project Manager: Office for Metropolitan Architecture
Main Contractor: China State Construction
Other Consultants: RWDI
 
 
 
 
 
 

[pagebreak]

Al Khatem Tower

 

 
Location: Abu Dhabi
Height: 509 feet
Function: Office
Completed: 2012
 
Building Team
Owner/Developer: Mubadala Real Estate & Infrastructure
Design Architect: Goettsch Partners
Structural Engineer: Oger International
MEP Engineer: Oger International
Project Manager: Mubadala Real Estate & Infrastructure
Main Contractor: Oger Abu Dhabi
 
 
 
 
 
 

The Shard

 

 
Location: London
Height: 1004 feet
Function: Mixed use (residential, office, hotel)
Completed: 2013
 
Building Team
Owner: London Bridge Quarter Ltd
Developer: Sellar Property Group
Design Architect: Renzo Piano Building Workshop
Associate Architect: Adamson Associates
Structural Engineer: WSP Group
MEP Engineer: Arup
Project Manager: Turner & Townsend
Main Contractor: Mace
Material Suppliers: Permasteelisa Group
Other Consultants: RWDI, KONE, Dow Corning Corporation, AECOM
 
 
 

Related Stories

| Jun 4, 2012

HBD Construction to build new training campus in St. Louis

Larger campus facility will expand training opportunities for plumbers and pipefitters.

| Jun 1, 2012

New BD+C University Course on Insulated Metal Panels available

By completing this course, you earn 1.0 HSW/SD AIA Learning Units.

| Jun 1, 2012

AIA 2030 Commitment Program reports new results

The full report contains participating firm demographics, energy reduction initiatives undertaken by firms, anecdotal accounts, and lessons learned.

| Jun 1, 2012

Ground broken for Children’s Hospital Colorado South Campus

Children’s Hospital Colorado expects to host nearly 80,000 patient visits at the South Campus during its first year.

| Jun 1, 2012

K-State Olathe Innovation Campus receives LEED Silver

Aspects of the design included a curtain wall and punched openings allowing natural light deep into the building, regional materials were used, which minimized the need for heavy hauling, and much of the final material included pre and post-consumer recycled content.

| Jun 1, 2012

New York City Department of Buildings approves 3D BIM site safety plans

3D BIM site safety plans enable building inspectors to take virtual tours of construction projects and review them in real-time on site.

| May 31, 2012

Product Solutions June 2012

Curing agents; commercial faucets; wall-cladding systems.

| May 31, 2012

3 Metal Roofing Case Studies Illustrate Benefits

Metal roofing systems offer values such as longevity, favorable life cycle costs, and heightened aesthetic appeal.

| May 31, 2012

AIA Course: High-Efficiency Plumbing Systems for Commercial and Institutional Buildings

Earn 1.0 AIA/CES learning units by studying this article and successfully completing the online exam.

| May 31, 2012

2011 Reconstruction Award Profile: Seegers Student Union at Muhlenberg College

Seegers Student Union at Muhlenberg College has been reconstructed to serve as the core of social life on campus.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021