The Council on Tall Buildings and Urban Habitat recently released 100 of the World’s Tallest Buildings, a book detailing the Top Company Rankings for numerous disciplines as derived from the projects found within the book's pages.
As part of its company rankings, the top contractors were listed and ranked according to the number of buildings within the world’s 100 tallest they have completed work on.
CSCEC Group of Companies was the only company to reach double digits, having worked on 21 buildings. The next closest firms were Arabian Construction Company and Shanghai Construction Group, tying for second with six buildings each.
You can view CTBUH’s top structural engineers list below or by clicking here.
Rank | Company | # of Buildings |
1 | CSCEC Group of Companies | 21 |
2 | Arabian Construction Company | 6 |
2 | Shanghai Construction Group | 6 |
4 | AECOM | 4 |
4 | Brookfield Multiplex | 4 |
4 | Samsung C&T Corporation | 4 |
7 | Hong Kong Construction (Holdings) Limited | 3 |
7 | Kumagai Gumi | 3 |
7 | Saudi Bin Laden Group | 3 |
7 | Turner Construction Company | 3 |
11 | Arabtec | 2 |
11 | Besix | 2 |
11 | Dubai Civil Engineering | 2 |
11 | Guangzhou Municipal Construction Group JV | 2 |
11 | Lend Lease | 2 |
Related Stories
High-rise Construction | Mar 24, 2015
Timber high-rise residential complex will tower over Stockholm waterfront
The four towers, 20 stories each, will be made entirely out of Swedish pine, from frame to façade.
Healthcare Facilities | Mar 23, 2015
Can advanced elevator technology take vertical hospitals to the next level?
VOA's Douglas King recalls the Odyssey project and ponders vertical transportation in high-rise healthcare design.
High-rise Construction | Mar 16, 2015
NBBJ creates 'shadowless' skyscraper concept for proposed UK development
A team of architects from the London branch of NBBJ used computer algorithms to generate a dual-tower design that maximizes sunlight reflections to eliminate the buildings' shadows.
High-rise Construction | Mar 16, 2015
Mexican Museum tower caught in turmoil to break ground this summer in San Francisco
Millennium Partners said it will break ground on the 53-story residential and museum tower while the lawsuits go through the appeals process.
Cultural Facilities | Mar 13, 2015
New Orleans observation tower to feature 320-foot double-helix gondola ride
Tricentennial Tower will take visitors on a 300-year journey through the city's history before landing them at the top for a 360-degree view of the Crescent City.
High-rise Construction | Mar 12, 2015
Developers confirm Renzo Piano’s contribution in Sydney harbor overhaul
If the entire development is approved, One Sydney Harbour will be Piano’s second project in Australia.
High-rise Construction | Mar 12, 2015
Foster and Partners designs 'The One' in Toronto
Developer Sam Mizrahi worked with Foster and Partners and Core Architects to design Toronto's tallest skyscraper aside from the CN Tower, The One, which will house a luxury shopping mall and condos.
High-rise Construction | Mar 11, 2015
Must see: Firm proposes skyscraper with a ‘twist’ in downtown Tulsa
Tulsa, Okla.-based architecture practice Kinslow, Keith & Todd released renderings of a skyscraper concept that takes the shape of a tornado.
Modular Building | Mar 10, 2015
Must see: 57-story modular skyscraper was completed in 19 days
After erecting the mega prefab tower in Changsha, China, modular builder BSB stated, “three floors in a day is China’s new normal.”
Office Buildings | Mar 5, 2015
Goettsch Partners unveils plans for dual office towers in Warsaw
The Mennica Legacy Tower development is divided into a 35-story tower located on the south east side of the site and a 10-story building on the west side.