flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

World Green Building Council: All buildings must be net zero by 2050 to avert 2°C rise

Codes and Standards

World Green Building Council: All buildings must be net zero by 2050 to avert 2°C rise

Building efficiency essential to tempering global climate change.


By Peter Fabris, Contributing Editor | June 21, 2017

Pixabay Public Domain

In order to keep the global temperature from rising above pre-industrial levels by 2°C, all the world’s buildings must reach net zero carbon by 2050, according to a report by the World Green Building Council.

Keeping the global temperature increase below 2°C would avert the most serious consequences of climate change, scientists believe, and that goal is in line with the Paris Agreement on climate change. All new buildings must operate at net zero carbon by 2030, and all existing buildings must be renovated to operate at net zero carbon by 2050, the report says.

The building and construction sector is responsible for around 30% of global energy consumption and associated greenhouse gas (GHG) emissions. The WGBC estimates that only 500 net zero commercial buildings and several thousand net zero residential units currently exist in the world.

Thus, there is a need for several billion net zero buildings worldwide, the report says. The report also finds that net zero buildings can create jobs, improve energy security, and lower energy costs.

Related Stories

| Dec 4, 2014

New airports raising green standards to new heights

Recent airport designs are bigger and much more efficient, based on a look at recent projects in Mexico City, London, and China.

| Dec 4, 2014

Rock Hill, S.C., puts moratorium on multifamily construction

City officials say the flurry of apartment construction over the past year has strained resources, including public services and infrastructure. 

| Dec 4, 2014

Ontario contractors renew push for prompt payment legislation

A new coalition of Ontario contractors, construction associations, suppliers and trade unions will push for a revival of prompt payment legislation late this year.

| Dec 4, 2014

Roofing material manufacturers extend research project on sustainable roofing

A coalition of trade groups is sponsoring continued analysis of a reroofing project at the Onondaga County Correctional Facility in Jamesville, New York.

| Nov 26, 2014

Colorado must fix construction defects law, Denver Post says

Colorado's “vexing construction defects law” has hampered the building of new condominiums in the state, according to an editorial in the Denver Post.

| Nov 26, 2014

Cheyenne, Wyoming City Council kills downtown design standards proposal

The Cheyenne, Wyoming City Council voted down a measure that would have implemented design standards for new construction and building additions downtown.

| Nov 26, 2014

ASTM International develops first product category rules for asphalt roofing industry

The Asphalt Roofing Manufacturers Association (ARMA) and ASTM International have developed Product Category Rules (PCR) for asphalt roofing in North America.

| Nov 26, 2014

International Green Construction Code will include option for outcome-based approach

The outcome-based approach requires the building owner to provide the building’s utility bills for a 12-month period within three years. 

| Nov 20, 2014

Pentagon is reviewing hospital construction standards

An independent review panel of military specialists met with healthcare leaders Nov. 12 to consider whether construction standards for medical centers should be strengthened to align with industry best practices.

| Nov 20, 2014

ConsensusDocs releases first standard agreement for commissioning contracting

The new standard contract provides a contractual vehicle for owners to save significant money from operation and maintenance costs regarding energy performance.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021