flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

World of Concrete 2012: A tinge of optimism

World of Concrete 2012: A tinge of optimism

Cement consumption is expected to increase significantly in 2013, the first time an increase has been predicted in the past five years.


By By BD+C Staff | January 26, 2012
Laticrete introduced their Supercap Pump Truck, a mobile blending unit that can
Laticrete introduced their Supercap Pump Truck, a mobile blending unit that can deliver up to 15 tons of material per hour at WO

World of Concrete 2012 wraps up Friday in Las Vegas and the show’s 50,000 attendees are optimistic and expect better days ahead.  

One indicator of the concrete market is the annual Cement Outlook presented by Ed Sullivan, economist for the Portland Cement Association, Skokie, Ill. Cement consumption is expected to increase significantly in 2013, the first time an increase has been predicted in the past five years.

While his presentation focused primarily on the infrastructure, he noted there was a “tinge of optimism” for other markets including public utilities, industrial, and retail sectors.

By 2017, cement consumption is expected to reach levels last recorded in 2005. “The construction market is in a 12-year peak-to-peak recovery,” said Sullivan. A number of factors, including a reduction in office vacancy rates as well as unemployment rates must come to fruition before the construction market sees a significant recovery, says Sullivan.

"Jobs will determine the growth rate in the economy and also shorten the healing process," Sullivan said. "The more jobs, the more recovery at the state level, the more construction spending."

A host of GCs and concrete contractors noted an increase in residential and commercial business, however their profit margins are expected remain small in 2012.

Meanwhile, WOC 2012 exhibitors rolled out a series of new products. Maxwell Systems showcased its new construction management software; ProSpec introduced a new high-strength grout that contributes to LEED credits; and Laticrete introduced their Supercap Pump Truck, a mobile blending unit that can deliver up to 15 tons of material per hour. BD+C

Related Stories

| Feb 15, 2011

New 2030 Challenge to include carbon footprint of building materials and products

Architecture 2030 has just broadened the scope of its 2030 Challenge, issuing an additional challenge regarding the climate impact of building products. The 2030 Challenge for Products aims to reduce the embodied carbon (meaning the carbon emissions equivalent) of building products 50% by 2030.

| Feb 14, 2011

Sustainable Roofing: A Whole-Building Approach

According to sustainability experts, the first step toward designing an energy-efficient roofing system is to see roof materials and systems as an integral component of the enclosure and the building as a whole. Earn 1.0 AIA/CES learning units by studying this article and successfully completing the online exam.

| Feb 14, 2011

More companies willing to pay extra for green office space

New CoreNet Global/Jones Lang LaSalle survey shows real estate executives forging green strategies that balance environmental, financial and workforce issues.

| Feb 11, 2011

Four Products That Stand Up to Hurricanes

What do a panelized wall system, a newly developed roof hatch, spray polyurethane foam, and a custom-made curtain wall have in common? They’ve been extensively researched and tested for their ability to take abuse from the likes of Hurricane Katrina.

| Feb 11, 2011

RS Means Cost Comparison Chart: Office Buildings

This month's RS Means Cost Comparison Chart focuses on office building construction.

| Feb 11, 2011

Sustainable features on the bill for dual-building performing arts center at Soka University of America

The $73 million Soka University of America’s new performing arts center and academic complex recently opened on the school’s Aliso Viejo, Calif., campus. McCarthy Building Companies and Zimmer Gunsul Frasca Architects collaborated on the two-building project. One is a three-story, 47,836-sf facility with a grand reception lobby, a 1,200-seat auditorium, and supports spaces. The other is a four-story, 48,974-sf facility with 11 classrooms, 29 faculty offices, a 150-seat black box theater, rehearsal/dance studio, and support spaces. The project, which has a green roof, solar panels, operable windows, and sun-shading devices, is going for LEED Silver.

boombox1
boombox2
native1

More In Category

Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021