flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Workplace trends survey reveals generational patterns in office use

Workplace trends survey reveals generational patterns in office use

Data analysis from Mancini•Duffy indicates significant variations among age cohorts in the workplace.


By Mancini•Duffy | July 21, 2014
Illustration: Gameanna via FreeDigitalPhotos.net
Illustration: Gameanna via FreeDigitalPhotos.net

Mancini•Duffy, a leading architectural and interiors firm, has released preliminary findings from The Coordinate, its survey on workplace trends. The survey indicates that working hours peak during the beginning and end of the day, where employees are not only more productive, but also give their employers a bonus by extending the workday during commuting time.  

Additional findings point to patterns in work days as well as work hours.  According to Mancini•Duffy’s Director of Workplace Innovation, Fran Ferrone, “Mondays are for planning, Fridays are for cleanup, and most meetings occur mid-week. We see this as not only impacting decisions about space, but about policy and perks; potentially, in a big way.”

The differences between ways in which generations see the workday are even sharper:

  • Younger generations make exercise a priority throughout the workday.
  • Older generations place importance on face time (vs. FaceTime) more than their younger counterparts.
  • Gen X and Y value their downtime – reflecting the trend toward project-based (vs. fulltime) work.

 

 

These findings are from the first in a series of surveys being conducted by Mancini•Duffy this year to test the hypothesis of “the dissolution of the traditional workweek.” Complete results (and their implications) will be published in early 2015. 

To participate in the Coordinate survey, visit: http://www.cvent.com/d/d4q2kp. Contact CWI@manciniduffy.com for additional information or questions about The Coordinate.

About Mancini•Duffy
Mancini•Duffy is a full service design firm specializing in architecture, planning, interior design and graphic design services.  Founded almost 100 years ago, the firm is headquartered in New York City.  Also, as a member of IPID, International Partners in Design, Mancini•Duffy serves the diverse needs of its expanding multi-national client base across the U.S. and in Great Britain, Europe, East Asia and Australia. http://www.manciniduffy.com/

Related Stories

| Jan 27, 2012

Columbia University’s New Core Laboratory aims for LEED Silver

Construction manager Sordoni Construction Co. along with the design team of Payette Architects and Vanderweil Engineers will provide design and construction services to renovate the majority of the existing Core Lab building to create the new Lamont Center for Bio-Geochemistry.

| Jan 26, 2012

Three dead, 16 missing in Rio buildings collapse

The buildings, one 20 floors high, collapsed on Wednesday night in a cloud of dust and smoke just one block away from the city's historic Municipal Theater.

| Jan 26, 2012

Siemens launches smoke detection knowledge center

New knowledge center web site demonstrates efficacy of smoke detection. 

| Jan 26, 2012

Hendrick Construction completes Osso Restaurant in Charlotte

Designed by François Fossard, Osso's upscale interior includes tapered, twisted decorative columns and an elegant fireplace in the center of the lounge. 

| Jan 26, 2012

HOK partners with USGBC on design of Haiti children's center

Passive design principles give form to a sustainable, restorative environment for the children of Haiti.

| Jan 26, 2012

American Standard names Gould as president and CEO

Gould succeeds Don Devine, who led the successful turnaround of American Standard Brands.

| Jan 26, 2012

Summit Design+Build completes law office in Chicago

Applegate & Thorne-Thomsen's new office suite features private offices, open office area, conference rooms, reception area, exposed wood beams and columns, and exposed brick. 

| Jan 24, 2012

New iPad app ready for prime time

Siemens’ versatile application connects users to APOGEE BAS control and monitoring functions via wireless network connectivity. The application directly interacts with BACnet/IP and Siemens APOGEE P2 field panels. 

| Jan 24, 2012

Vyhanek joins Thornton Tomasetti’s Kansas City office

Vyhanek will assemble a new MEP team in the Midwest to support Building Performance and Property Loss Consulting practices. 

| Jan 24, 2012

U of M installs new lighting at Crisler Player Development Center

Energy efficient lighting installed at PDC reduce costs and improves player performance.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021