flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Work on Oxnard, Calif. shopping center resumes after a three-year hiatus

Work on Oxnard, Calif. shopping center resumes after a three-year hiatus

Stalled since 2009, developers of the Collection at RiverPark decided to restart construction on the outdoor mall. 


By By Roger Vincent, Los Angeles Times | March 16, 2012
Developers of the Collection at RiverPark in Oxnard, Calif., decided to restart
Developers of the Collection at RiverPark in Oxnard, Calif., decided to restart construction on the outdoor mall, which has been

In a sign of confidence in the region's recovering economy, developers have resumed construction of a $150-million shopping center in Oxnard, Calif.

Work on the Collection at RiverPark, a large outdoor mall intended to look like a small-town shopping district, was halted in 2009 when the nation was in a recession. Consumers closed their wallets and retailers canceled expansion plans.

"There was a lot of fear in the markets in 2008 and 2009, and that has gone away," said Colm Macken, chief executive of Aliso Viejo developer Shea Properties. "We are seeing employment growth, and retail sales are increasing."

Most important for Shea: Retailers feel confident enough to sign leases for new stores.

Click here to read more. BD+C

Related Stories

| Nov 14, 2011

Griffin Electric completes electrical work at Cary Arts Center

  The Griffin Electric team was responsible for replacing the previous electrical service on-site with a 1000A, 480/277V service and providing electrical feeds for a new fire pump chiller, six air-handlers and two elevators.

| Nov 14, 2011

303 East 33rd Street building achieves LEED-NC

  The 165,000 sf 12-story residential building is the first green development to be LEED certified in the Murray Hill neighborhood of Manhattan.

| Nov 14, 2011

VanSumeren appointed to Traco general manager

VanSumeren will draw on his more than 20 years of experience in manufacturing management and engineering to deliver operational and service excellence and drive profitable growth for Traco. 

| Nov 11, 2011

By the Numbers

What do ‘46.9,’ ‘886.2,’ and ‘171,271’ mean to you? Check here for the answer.

| Nov 11, 2011

Streamline Design-build with BIM

How construction manager Barton Malow utilized BIM and design-build to deliver a quick turnaround for Georgia Tech’s new practice facility.

| Nov 11, 2011

AIA: Engineered Brick + Masonry for Commercial Buildings

Earn 1.0 AIA/CES learning units by studying this article and successfully completing the online exam. 

| Nov 11, 2011

How Your Firm Can Win Federal + Military Projects

The civilian and military branches of the federal government are looking for innovative, smart-thinking AEC firms to design and construct their capital projects. Our sources give you the inside story.

| Nov 10, 2011

BD+C's 28th Annual Reconstruction Awards

A total of 13 projects recognized as part of BD+C's 28th Annual Reconstruction Awards.

| Nov 10, 2011

Grousbeck Center for Students & Technology opens doors

New Perkins School for the Blind Building is dedicated to innovation, interaction, and independence for students.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021