flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Work on Oxnard, Calif. shopping center resumes after a three-year hiatus

Work on Oxnard, Calif. shopping center resumes after a three-year hiatus

Stalled since 2009, developers of the Collection at RiverPark decided to restart construction on the outdoor mall. 


By By Roger Vincent, Los Angeles Times | March 16, 2012
Developers of the Collection at RiverPark in Oxnard, Calif., decided to restart
Developers of the Collection at RiverPark in Oxnard, Calif., decided to restart construction on the outdoor mall, which has been

In a sign of confidence in the region's recovering economy, developers have resumed construction of a $150-million shopping center in Oxnard, Calif.

Work on the Collection at RiverPark, a large outdoor mall intended to look like a small-town shopping district, was halted in 2009 when the nation was in a recession. Consumers closed their wallets and retailers canceled expansion plans.

"There was a lot of fear in the markets in 2008 and 2009, and that has gone away," said Colm Macken, chief executive of Aliso Viejo developer Shea Properties. "We are seeing employment growth, and retail sales are increasing."

Most important for Shea: Retailers feel confident enough to sign leases for new stores.

Click here to read more. BD+C

Related Stories

| Dec 4, 2012

Wagner joins Ghafari as Manager of Structural Engineering

Wagner comes to Ghafari from Walter P Moore, where he served as a principal, chaired the construction administration task force and led the design of numerous projects ranging in size from $10 million to $70 million.

| Dec 4, 2012

City of Gainesville to break ground on $33 million bus fleet maintenance and ops facility

The 140,000-sf facility will include dispatch, administrative and maintenance facilities.

| Nov 28, 2012

Project team to showcase design for first mixed-use retail center of its kind in Mexico City

Project reaching construction milestone, offering national model for urban development in Mexico.

| Nov 28, 2012

Cummins announces ratings classification for data center power systems

The Data Center Continuous ratings span the range of Cummins Power Generation’s high horsepower diesel generator sets, from 1 MW up to 2.5 MW, and will apply to both 50 Hz and 60 Hz configurations.

| Nov 28, 2012

Francis Cauffman appoints Stainbrook Director of Higher Education

Stainbrook has 16 years of experience as a strategic planner and urban designer working on complex projects on- and off-campus.

| Nov 27, 2012

SFIA releases technical guide for cold-formed steel framing products

The 114-page book covers both structural and non-structural applications, including section properties of SFIA member product profiles, and complete load and span tables for most applications.

| Nov 21, 2012

Architecture Billings Index positive for third straight month

All regions reporting positive business conditions

| Nov 20, 2012

PC Construction completes Juniper Hall at Champlain College

Juniper Hall is on track for LEED Gold certification from the U.S. Green Building Council.

| Nov 14, 2012

U.S. Green Building Council partners with Pearson

Partnership will help further USGBC’s mission by advancing green building education

| Nov 14, 2012

U.S. Green Building Council announces grant from Google to catalyze transformation of building materials industry and indoor health

Focus is on healthy building materials to promote indoor environmental quality and human health

boombox1
boombox2
native1

More In Category

Great Solutions

41 Great Solutions for architects, engineers, and contractors

AI ChatBots, ambient computing, floating MRIs, low-carbon cement, sunshine on demand, next-generation top-down construction. These and 35 other innovations make up our 2024 Great Solutions Report, which highlights fresh ideas and innovations from leading architecture, engineering, and construction firms.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021