Woolpert has acquired Sheehan Nagle Hartray Architects, a full-service architecture firm that specializes in mission critical and technically challenging projects, interior design and predesign services for commercial, civic and education clients. SNHA has offices in Chicago and London.
Principal Neil Sheehan said SNHA wanted to join a nimble, entrepreneurial culture with whom they could develop a visionary, global business strategy. He said in Woolpert, SNHA found transparency and knowledge-sharing across all levels, with clear aspirations for future growth, productivity and success.
“Woolpert shares our drive for design excellence and understands that innovation is evolutionary, while providing services that complement our own,” Sheehan said. “In addition, Woolpert’s geospatial and engineering capabilities underscore our expertise, allowing us to integrate emerging technologies like computational design, digital twins, reality capture, carbon tracking, and virtual and augmented reality.”
Woolpert Vice President and Buildings Sector Leader Suzette Stoler lauded the SNHA staff for their passion, integrity and advancement of next-level, sustainable design.
“We admire what SNHA has accomplished over the last 50 years and are thrilled that they are part of our Woolpert family,” Stoler said. “Together we will enhance our dynamic design culture across the globe, while providing meaningful and sustainable solutions for our clients and the industry.”
“In addition to industry leadership in data center design, SNHA marks another key milestone in our global expansion plan,” Woolpert CEO Scott Cattran said. “With existing Woolpert offices already in North America, Africa, Australia and Asia, SNHA expands our design excellence in Europe and extends our capabilities as a global company.”
AEC Advisors initiated this transaction and acted as a financial advisor to Sheehan Nagle Hartray Architects.
Related Stories
| May 14, 2014
Construction growth looking up: Gilbane Spring 2014 Economic Report
Construction spending for 2014 should finish 6.6% higher than in 2013, with nonresidential work contributing substantially.
| May 14, 2014
Prefab payback: Mortenson quantifies cost and schedule savings from prefabrication techniques
Value-based cost-benefit analysis of prefab approaches on the firm's 360-bed Exempla Saint Joseph Heritage Project shows significant savings for the Building Team.
| May 13, 2014
First look: Nadel's $1.5 billion Dalian, China, Sports Center
In addition to five major sports venues, the Dalian Sports Center includes a 30-story, 440-room, 5-star Kempinski full-service hotel and conference center and a 40,500-square-meter athletes’ training facility and office building.
| May 13, 2014
Drexel University case study report: Green Globes cheaper, faster than LEED
GBI’s Green Globes certification process is significantly less expensive to conduct and faster to complete than LEED certification, says Drexel prof.
| May 13, 2014
Steven Holl's sculptural Institute for Contemporary Art set to break ground at VCU
The facility will have two entrances—one facing the city of Richmond, Va., the other toward VCU's campus—to serve as a connection between "town and gown."
| May 13, 2014
Universities embrace creative finance strategies
After Moody’s and other credit ratings agencies tightened their standards a few years ago, universities had to become much more disciplined about their financing mechanisms.
| May 13, 2014
19 industry groups team to promote resilient planning and building materials
The industry associations, with more than 700,000 members generating almost $1 trillion in GDP, have issued a joint statement on resilience, pushing design and building solutions for disaster mitigation.
| May 13, 2014
Libeskind wins competition to design Canadian National Holocaust Monument
A design team featuring Daniel Libeskind and Gail Dexter-Lord has won a competition with its design for the Canadian National Holocaust Monument in Toronto. The monument is set to open in the autumn of 2015.
| May 12, 2014
Defining BIM – What do owners really want?
Given the complexities of the building process, it can be difficult for building owners to effectively communicate what they want and need with BIM. The response to the question usually is, “Give me everything.”
| May 12, 2014
The best of affordable housing: 4 projects honored with 2014 AIA/HUD Secretary Awards [slideshow]
The winners include two dramatic conversions of historic YMCA buildings into modern, affordable multifamily complexes.