flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

A wood-clad arena is rising in Copenhagen

Sports and Recreational Facilities

A wood-clad arena is rising in Copenhagen

The design of this 377,000-sf building makes concessions to the residential community that surrounds it.


By John Caulfield, Senior Editor | October 12, 2016

The 377,000-sf Royal Arena in Copenhagen will include plazas that residents of the surrounding neighborhood can take advantage of. Image: Adam Mørk, Courtesy of 3XN Architects

 

The new Royal Arena in Copenhagen, Denmark, which is scheduled to open early next year, aspires to integrate seamlessly into the largely residential neighborhood of Ørestad (which sits between City Hall and Copenhagen Airport) through design refinements that bring this massive—35,000-sm (377,000-sf)—multipurpose building to a human scale.

“The project looks both inward and out,” says Jan Ammundsen, Senior Partner with 3XN Architects, the project’s designer. That balance will be achieved by the combination of two primary elements: a plinth that absorbs the movement of spectators through a variety of small plazas, pockets, stairs and gathering areas carved from the plinth’s perimeter; and the “bowl” inside whose design prioritizes clear sight lines and wayfinding, service, and smoother visitor circulation.

The building’s design also addresses the “passive user” who may not even enter the arena, with four smaller public squares around the arena, which establish inviting areas where locals can socialize, play sports, or relax.

Ørestad is accessible by car, metro, and trains, and the arena will be situated at the heart of a new urban district that will include housing, offices, and an ice rink. Local planning also allows for a new primary and lower secondary school with sports facilities.

The oval-shaped arena, which can accommodate up to 16,000 people, features a semi-transparent glass façade system topped with wooden fins that are up to 35 meters long. The façade that allows natural light to pour in is coupled with warm materials to make a strong connection with the plinth.

The design also protects the surrounding area from noise pollution. A 3D-model was used to determine the typical sound pressure level for concerts held in the arena. By doing so, the agreed noise limits can be determined and the optimal sound insulation performance level of each part of the facade and roof can be calculated.

The Building Team on this project includes HKS (arena specialist), ARUP and ME Engineers (engineering), and Planit-IE (landscape architect). Other consultants that worked with Arena CPHX—a company that was formed to oversee construction of the arena—include Davis Langdon (an AECOM company), and COWI as the project manager.

The building is owned by Realdania and the Municipality of Copenhagen, which each kicked in 325 million Danish Krone (US$48.2 million) for this project. A committee under the Danish Ministry of Culture also made a conditional contribution of 15 million DKK.

Live Nation will operate the arena, which will open on February 3 with a performance by the rock group Metallica, whose drummer, Lars Ulrich, is Danish.

 

Wooden fins up to 35 meters long form the cladding over the semi-transparent exterior of the Royal Arena. Image: Adam Mørk, Courtesy of 3XN Architects.

Related Stories

Building Team Awards | May 23, 2016

'Greenest ballpark' proves a winner for St. Paul Saints

Solar arrays, a public art courtyard, and a picnic-friendly “park within a park" make the 7,210-seat CHS Field the first ballpark to meet Minnesota sustainable building standards.

Sports and Recreational Facilities | May 20, 2016

Texas Rangers announce plans for $1 billion retractable roof ballpark

The new stadium will replace Globe Life Park, which is only 22 years old.  

Sports and Recreational Facilities | May 19, 2016

Audacy brings wireless lighting controls to Wrigley Field’s new clubhouse

The Audacy system uses a combination of motion sensors, luminaire controllers, light sensors, and switches that are all connected and coordinated by Gateways.

Sports and Recreational Facilities | May 6, 2016

NBA’s Atlanta Hawks to build new practice center with attached medical facilities

The team will have easy access to an MRI machine, 3D motion capture equipment, and in-ground hydrotherapy. 

BIM and Information Technology | May 2, 2016

How HDR used computational design tools to create Omaha's UNO Baxter Arena

Three years after writing a white paper about designing an arena for the University of Nebraska Omaha, HDR's Matt Goldsberry says it's time to cherry-pick the best problem-solving workflows.

Mixed-Use | May 1, 2016

A man-made lagoon with a Bellagio-like fountain will be the highlight of a mixed-use project outside Dallas

Construction will soon begin on housing, retail, and office spaces.

Sports and Recreational Facilities | Apr 17, 2016

An expanded and renovated complex brings together U. of Colorado’s sports programs

This two-year project enhances the experiences of athletes and fans alike.

Sports and Recreational Facilities | Apr 13, 2016

Cubs take a measured approach when planning HD video boards

Along with the mammoth and super-sharp video boards, Wrigley Field's 1060 Project includes renovated bleachers, upgraded player amenities, and more concourses, decks, and concessions.

Sports and Recreational Facilities | Apr 13, 2016

More than a game: 4 ways sports teams are adapting to changing fan preferences

As the cost of tickets, parking, and concessions skyrockets, while home theater technology becomes more affordable, fans wonder: Why even bother going to the game? Here’s how progressive sports owners and Building Teams are packing stadium seats.

Sports and Recreational Facilities | Apr 11, 2016

Chicago Cubs continue Wrigley Field renovations with new clubhouse

The team found 30,000 sf of space underneath an old parking lot, nearly tripling the size of the old clubhouse. 

boombox1
boombox2
native1

More In Category




Mixed-Use

A surging master-planned community in Utah gets its own entertainment district

Since its construction began two decades ago, Daybreak, the 4,100-acre master-planned community in South Jordan, Utah, has been a catalyst and model for regional growth. The latest addition is a 200-acre mixed-use entertainment district that will serve as a walkable and bikeable neighborhood within the community, anchored by a minor-league baseball park and a cinema/entertainment complex.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021