flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

A woman-led CM team manages the expansion and renovation of a woman-focused hospital in Nashville

Healthcare Facilities

A woman-led CM team manages the expansion and renovation of a woman-focused hospital in Nashville

This design-build project includes adding six floors for future growth.


By John Caulfield, Senior Editor | June 27, 2023
Superintendent Kennedy May of JE Dunn is running to expansion of Williamson Medical Center.
JE Dunn's Kennedy May is supervising the expansion and renovation of Williamson Medical Center in Franklin, Tenn. Images: Courtesy of JE Dunn Construction

Williamson Health, a regional healthcare system based in Franklin, Tenn., with 30-plus locations nationwide, has built a reputation for women’s healthcare. This year alone, The Women’s Choice Award for Best Hospitals recognized Williamson Health for its women’s services, comprehensive breast care, mammograms, and obstetrics.

So it is, perhaps, fitting that a woman-led team from the general contractor JE Dunn Construction has been supervising a $200 million, 225,000-sf expansion and renovation of the system’s flagship Williamson Medical Center near Nashville. The project includes 31,932 sf of improvements, a 15-room Emergency Department addition, a six-story addition for patient rooms, and another six stories that are earmarked for future expansion. (The Franklin hospital is in one of the faster-growing counties in the U.S.)

Earlier this month, the hospital officially opened its new state-of-the-art postpartum wing, with 11 beds, and a newborn nursery. The hospital’s OB and NICU are being updated with renovated and expanded labor, delivery, and recovery rooms. The Neonatal Intensive Care Unit is being moved to its own secure wing.

This design-build project, which is scheduled for completion next year, is designed by ESa. Nashville Machine Service is its mechanical engineer, and Enterprise Solutions its electrical engineer. Once this project is finished, the hospital plans to renovate its existing buildings.

 

One of the postpartum rooms added to Williamson Medical Center
One of the 11 new postpartum rooms that were added to Williamson Medical Center's facility in Tennessee.
 

Empathetic communications

Williamson Medical Center is the first start-to-finish construction management project for Kennedy May, a superintendent who has been with JE Dunn for more than six years. On her team is senior project engineer Emily McCaw, a three-year JE Dunn veteran.

May tells BD+C that having a female management team running the build has been beneficial for communicating with the hospital staff, “who were a delight to work with.” The hospital has stayed open during the project, so May has had to coordinate shutdowns for roads, mechanical installations, and night work to install water tie-ins.

JE Dunn’s Healthcare Group is based in Nashville, and has had a relationship with the healthcare system spanning several years. May—whose grandfather was a healthcare superintendent for Hoar Construction—is based in Colorado, where her healthcare assignments have included several renovations for Swedish Medical Center in Englewood.

Related Stories

| Mar 19, 2012

HKS Selected for Baylor Medical Center at Waxahachie

Baylor Medical Center at Waxahachiewill incorporate advanced technology including telemedicine, digital imaging, remote patient monitoring, electronic medical records and computer patient records. 

| Mar 14, 2012

Tsoi/Kobus and Centerbrook to design Jackson Laboratory facility in Farmington, Conn.

Building will house research into personalized, gene-based cancer screening and treatment.

| Mar 6, 2012

Country’s first Green House home for veterans completed

Residences at VA Danville to provide community-centered housing for military veterans.

| Mar 1, 2012

7 keys to ‘Highest value, lowest cost’ for healthcare construction

The healthcare design and construction picture has been muddied by uncertainty over the new healthcare law. Hospital systems are in a bind, not knowing what levels of reimbursement to expect. Building Teams serving this sector will have to work even harder to meet growing client demands.

| Feb 29, 2012

Construction begins on Keller Army Community Hospital addition

The 51,000 square foot addition will become the home for optometry, ophthalmology, physical therapy, and orthopedics clinics, as well as provide TRICARE office space.

| Feb 29, 2012

Shepley Bulfinch selected to design new Children’s Hospital of Buffalo

The firm was selected because of their past experience in designing clinically complex facilities that emphasize patient- and family-centered care and operational efficiency as well as distinctive architectural forms for many other children's and women's hospitals.

| Feb 28, 2012

More than 1,000 have earned EDAC certification since 2009

Milestone achieved as evidence-based design becomes a top 2012 strategy for healthcare organizations.

| Feb 28, 2012

McCarthy completes second phase of San Diego’s Scripps Hospital

Representing the second phase of a four-phased, $41.3 million expansion and remodeling project, the new addition doubles the size of the existing emergency department and trauma center to encompass a combined 27,000 square feet of space. 

| Feb 28, 2012

Griffin Electric completes Medical University of South Carolina project

The 210,000-sf complex is comprised of two buildings, and houses research, teaching and office areas, plus conference spaces for the University.

boombox1
boombox2
native1

More In Category


Great Solutions

41 Great Solutions for architects, engineers, and contractors

AI ChatBots, ambient computing, floating MRIs, low-carbon cement, sunshine on demand, next-generation top-down construction. These and 35 other innovations make up our 2024 Great Solutions Report, which highlights fresh ideas and innovations from leading architecture, engineering, and construction firms.



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021