flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Wirtz Beverage Illinois’ corporate headquarters completed

Wirtz Beverage Illinois’ corporate headquarters completed

WBI Center, a new state-of-the-art facility, is designed by Ware Malcomb.


By Posted by Tim Gregorski, Senior Editor | December 4, 2012
The 500,000-sf warehouse contains one of the largest temperature-controlled wine
The 500,000-sf warehouse contains one of the largest temperature-controlled wine storage components in the country.

International design firm, Ware Malcomb, announced the completion of Wirtz Beverage Illinois’ project: a new 605,000-sf corporate headquarters located at 3333 South Laramie Avenue, Cicero, Ill.

The new state-of-the-art facility, also known as WBI Center, consolidates four Wirtz Beverage locations into one monumental hub for sales, distribution, and training programs. Ware Malcomb provided architectural design and interior design services to Wirtz Realty Group [the newly formed real estate arm of Wirtz Corporation] for this ambitious and innovative project that integrates offices, conference centers, training facilities with warehouse and distribution areas.

Several unique technological features were incorporated throughout the facility. For example, digital signage screens can be found embedded in hallway floors and lobby areas. The 500,000-sf warehouse contains one of the largest temperature-controlled wine storage components in the country. A leading factor that drove the entire design of the site, the building’s shell, and its utility systems is the high-tech Automated Storage and Retrieval System (ASRS) with high bay robotic picking.

The general contractor for the project was Ryan Companies US, Inc. +

Related Stories

| Nov 6, 2012

Simpson Strong-Tie donates $25K to hurricane support

The company will also be matching employees’ personal contributions to the Red Cross and other nonprofit disaster relief organizations.

| Nov 6, 2012

Goettsch Partners designs new tower in Shunde, China

200-meter-tall building will be located between Guangzhou and Hong Kong.

| Nov 5, 2012

Brasfield & Gorrie awarded new steel processing facility for Kloeckner Metals

The construction will take place on a 16-acre greenfield site at ThyssenKrupp Industrial Park in Calvert.

| Nov 5, 2012

Trimble acquires Vico assets, extends design-build-operate capabilities

Software to add 5D management to Trimble’s Solutions for vertical construction contractors.

| Oct 30, 2012

Lord, Aeck & Sargent announces four student life facility wins

Projects recognize the architecture firm’s expertise on a nationwide basis.

| Oct 30, 2012

The Beck Group announces CEO succession plan

Current Eastern Division Director and company veteran, Fred Perpall, named CEO.

| Oct 30, 2012

Two-hour fire rated curtain wall passes CDC tests

CDC (Curtain Wall Design and Consulting) is an independent firm providing a wide range of building envelope design, engineering, and consulting services to design professionals nationwide.

| Oct 30, 2012

Wight & Company announces three hires

Expands team and adds staff to work on the UNO project.

| Oct 15, 2012

Silicones from Dow Corning solve high-altitude technical challenges at the world’s tallest tower

The spectacular Burj Khalifa skyscraper soars to 828m above ground level, holding the record for being the world’s tallest building and also for the highest installation of an aluminum and glass façade. To take on its numerous challenges and technical difficulties, it required proven silicone solutions and full support from Dow Corning.

| Oct 15, 2012

Three new members elected to AISC Board of Directors

New members will immediately begin serving on the AISC Board of Directors, assisting with the organization's planning and leadership in the steel construction industry.

boombox1
boombox2
native1

More In Category




Resiliency

U.S. is reducing floodplain development in most areas

The perception that the U.S. has not been able to curb development in flood-prone areas is mostly inaccurate, according to new research from climate adaptation experts. A national survey of floodplain development between 2001 and 2019 found that fewer structures were built in floodplains than might be expected if cities were building at random.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021