Denmark-based architecture firm 3XN's design won the architectural competition for Mälardalen University's new educational facility in Eskilstuna, southwest of Stockholm, Architecturelab reports.
The new building's cubic shape, geometric trellis, and bright façade is a nod to the nearby historical, modernist public bathhouse designed by Paul Hedqvist in the 1930s.
The winning proposal is of a 196,441-sf structure that will house educational facilities and workplaces for 4,000 students and 350 students. The project is estimated to cost €49 million.
The firm said about the conversion:
"Internally, the new building connects to the public bath on the first to decks, creating a cohesive flow between old and new. The lower levels will be completely open and connected so that the new and old building seen as one functional and spatial whole. The volume of the main swimming pool is retained as the school library. By also locating the café and student house in the public bath, it becomes a unique social meeting place for the students.
"A central atrium, double-height auditoriums, open study areas and inner courtyards create a building with good visual connections between floors. Classrooms and lecture halls are located on the lower three floors. The administrative offices are at the top of the building, creating a more private working environment."
Related Stories
| Jun 12, 2013
5 building projects that put the 'team' in teamwork
The winners of the 2013 Building Team Awards show that great buildings cannot be built without the successful collaboration of the Building Team.
| Jun 12, 2013
Sacred synergy achieves goals for religious education [2013 Building Team Award winner]
A renovation/addition project at Columbia Theological Seminary unites a historic residence hall with a modern classroom facility.
| Jun 12, 2013
‘Talking’ Braille maps help the visual impaired
Talking pen technology, combined with tactile maps, allows blind people to more easily make their way around BART stations in the Bay Area.
| Jun 11, 2013
Music/dance building supports sweet harmony [2013 Building Team Award winner]
A LEED Gold project enhances a busy Chicago neighborhood, meeting ambitious criteria for acoustical design and adaptability.
| Jun 11, 2013
Vertical urban campus fills a tall order [2013 Building Team Award winner]
Roosevelt University builds a 32-story tower to satisfy students’ needs for housing, instruction, and recreation.
| Jun 11, 2013
Building a better box: High-bay lab aims for net-zero [2013 Building Team Award winner]
Building Team cooperation and expertise help Georgia Tech create a LEED Platinum building for energy science.
| Jun 11, 2013
Finnish elevator technology could facilitate supertall building design
KONE Corporation has announced a new elevator technology that could make it possible for supertall buildings to reach new heights by eliminating several problems of existing elevator technology. The firm's new UltraRope hoisting system uses a rope with a carbon-fiber core and high-friction coating, rather than conventional steel rope.
| Jun 10, 2013
Lake Washington STEM school combines modular and site-built construction to meet ambitious schedule
When the Lake Washington School District outside Seattle needed a new high school built on an ambitious permitting and construction schedule of seven months, modular construction proved to be an ideal solution.
| Jun 7, 2013
Must see: Building façade made of massive concrete drain pipes
Looking to create a unique atmosphere using natural materials for the Prahran Hotel pub near Melbourne, local architect Techné Architects cleverly incorporated a series of concrete sewer pipes into the building's main façade.
| Jun 7, 2013
40 Under 40 retrospective: Where are they now?
Every month we’ll be catching up with past 40 Under 40 honorees to see what they’ve been up to since winning the award. This month we focus on a construction manager and a healthcare designer.