The fourth annual Architecture at Zero competition, sponsored by the Pacific Gas and Electric Company, has wrapped up, with five design concepts selected as winners.
The competition challenged design teams to create zero-net-energy (ZNE) buildings for the Jack London Gateway project site in Oakland, Calif. It involved two parts: affordable family housing over a childcare center or wellness clinic, and market-rate housing over a grocery store.
The California Public Utility Commission has a goal for new residential buildings to be ZNE by 2020, and for new commercial buildings to be ZNE by 2030. The Architecture at Zero competition is an attempt to make this goal a reality. It's open to students, architects, landscape architects, urban planners, engineers, and designers all over the world.
Check out the five award winners:
Merit Award – Student
Image Courtesy of Architecture at Zero
Gateway Residences
Judson University
Elgin, IL
Project Manager: Eric Blowers
Sustainability Specialist: Jaclein Ely
Designer: David Merlo
Detail Drawing Manager: Kathryn Husar
Diagrams/Illustrations Specialist: Peter Lukacs
Sponsored Faculty Member: Keelan Kaiser
Merit Award – Student
Image Courtesy of Architecture at Zero
The Wave
University of Aalborg
Copenhagen, Denmark
Project Architects & Engineers: Elias Mohr Jensen, Jonas Snedevind Nielsen and Henrik Jacobsen
Honor Award - Professional
Image Courtesy of Architecture at Zero
Embracing Limits
3r studio
Oakland, CA
Project Architects: Le Pham and Mai Tran
Energy Consultant: Hung Dang
Honor Award - Professional
Image Courtesy of Architecture at Zero
Symbiosis
Montreal, Canada
Team: Rocio Carvajo Lucena, Architect, LEED, Sergio Carretero Gomez, Architect, Josiane Crampé, M. Architect, and Geoffrey Diackiw, M. Architect
Special Recognition Award - Professional
Image Courtesy of Architecture at Zero
Flourish
SERA & Glumac
Portland, OR
Project Manager/Designer/Technical Documents: Katie Felver
Designer/Technical Documents: Nathan Burton
Designer/Graphics: Artur Grochowski
Graphics Assist: Jodi Hanson
Designer Biophilia Specialist: Matt Piccone
Designer: Jeffrey Maas
Project Engineer/Energy Modeler: Brian Goldsmith
Envelope Advisor: Mark Perepelitza
Design Advisor: Jeff Roberts
Project Management/Daylight Advisor: Lisa Petterson
Energy Advisor: Chris Lowen
Energy Advisor: James Thomas
Related Stories
| Nov 1, 2010
Vancouver’s former Olympic Village shoots for Gold
The first tenants of the Millennium Water development in Vancouver, B.C., were Olympic athletes competing in the 2010 Winter Games. Now the former Olympic Village, located on a 17-acre brownfield site, is being transformed into a residential neighborhood targeting LEED ND Gold. The buildings are expected to consume 30-70% less energy than comparable structures.
| Oct 27, 2010
Grid-neutral education complex to serve students, community
MVE Institutional designed the Downtown Educational Complex in Oakland, Calif., to serve as an educational facility, community center, and grid-neutral green building. The 123,000-sf complex, now under construction on a 5.5-acre site in the city’s Lake Merritt neighborhood, will be built in two phases, the first expected to be completed in spring 2012 and the second in fall 2014.
| Oct 21, 2010
GSA confirms new LEED Gold requirement
The General Services Administration has increased its sustainability requirements and now mandates LEED Gold for its projects.
| Oct 18, 2010
World’s first zero-carbon city on track in Abu Dhabi
Masdar City, the world’s only zero-carbon city, is on track to be built in Abu Dhabi, with completion expected as early as 2020. Foster + Partners developed the $22 billion city’s master plan, with Adrian Smith + Gordon Gill Architecture, Aedas, and Lava Architects designing buildings for the project’s first phase, which is on track to be ready for occupancy by 2015.
| Oct 13, 2010
Editorial
The AEC industry shares a widespread obsession with the new. New is fresh. New is youthful. New is cool. But “old” or “slightly used” can be financially profitable and professionally rewarding, too.
| Oct 13, 2010
Prefab Trailblazer
The $137 million, 12-story, 500,000-sf Miami Valley Hospital cardiac center, Dayton, Ohio, is the first major hospital project in the U.S. to have made extensive use of prefabricated components in its design and construction.
| Oct 13, 2010
Hospital tower gets modern makeover
The Wellmont Holston Valley Medical Center in Kingsport, Tenn., expanded its D unit, a project that includes a 243,443-sf addition with a 12-room operating suite, a 36-bed intensive care unit, and an enlarged emergency department.
| Oct 13, 2010
Apartment complex will offer affordable green housing
Urban Housing Communities, KTGY Group, and the City of Big Bear Lake (Calif.) Improvement Agency are collaborating on The Crossings at Big Bear Lake, the first apartment complex in the city to offer residents affordable, eco-friendly homes. KTGY designed 28 two-bedroom, two-story townhomes and 14 three-bedroom, single-story flats, averaging 1,100 sf each.
| Oct 13, 2010
Residences bring students, faculty together in the Middle East
A new residence complex is in design for United Arab Emirates University in Al Ain, UAE, near Abu Dhabi. Plans for the 120-acre mixed-use development include 710 clustered townhomes and apartments for students and faculty and common areas for community activities.
| Oct 13, 2010
Community center under way in NYC seeks LEED Platinum
A curving, 550-foot-long glass arcade dubbed the “Wall of Light” is the standout architectural and sustainable feature of the Battery Park City Community Center, a 60,000-sf complex located in a two-tower residential Lower Manhattan complex. Hanrahan Meyers Architects designed the glass arcade to act as a passive energy system, bringing natural light into all interior spaces.