flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Winners of the 2014 Architecture at Zero competition announced

Winners of the 2014 Architecture at Zero competition announced

The competition challenged design teams to create zero-net-energy buildings for the Jack London Gateway project site in Oakland, Calif. 


By BD+C Staff | January 14, 2015

The fourth annual Architecture at Zero competition, sponsored by the Pacific Gas and Electric Company, has wrapped up, with five design concepts selected as winners

The competition challenged design teams to create zero-net-energy (ZNE) buildings for the Jack London Gateway project site in Oakland, Calif. It involved two parts: affordable family housing over a childcare center or wellness clinic, and market-rate housing over a grocery store.

The California Public Utility Commission has a goal for new residential buildings to be ZNE by 2020, and for new commercial buildings to be ZNE by 2030. The Architecture at Zero competition is an attempt to make this goal a reality. It's open to students, architects, landscape architects, urban planners, engineers, and designers all over the world.

Check out the five award winners:

 

Merit Award – Student


Image Courtesy of Architecture at Zero

Gateway Residences
Judson University 
Elgin, IL 
Project Manager: Eric Blowers
Sustainability Specialist: Jaclein Ely
Designer: David Merlo
Detail Drawing Manager: Kathryn Husar
Diagrams/Illustrations Specialist: Peter Lukacs
Sponsored Faculty Member: Keelan Kaiser

 

 

Merit Award – Student 


Image Courtesy of Architecture at Zero

The Wave
University of Aalborg 
Copenhagen, Denmark 
Project Architects & Engineers: Elias Mohr Jensen, Jonas Snedevind Nielsen and Henrik Jacobsen

 

 

Honor Award - Professional


Image Courtesy of Architecture at Zero

Embracing Limits
3r studio 
Oakland, CA 
Project Architects: Le Pham and Mai Tran
Energy Consultant: Hung Dang

 

 

Honor Award - Professional


Image Courtesy of Architecture at Zero

Symbiosis
Montreal, Canada 
Team: Rocio Carvajo Lucena, Architect, LEED, Sergio Carretero Gomez, Architect, Josiane Crampé, M. Architect, and Geoffrey Diackiw, M. Architect

 

 

Special Recognition Award - Professional


Image Courtesy of Architecture at Zero

Flourish
SERA & Glumac 
Portland, OR 
Project Manager/Designer/Technical Documents: Katie Felver
Designer/Technical Documents: Nathan Burton
Designer/Graphics: Artur Grochowski
Graphics Assist: Jodi Hanson
Designer Biophilia Specialist: Matt Piccone
Designer: Jeffrey Maas
Project Engineer/Energy Modeler: Brian Goldsmith
Envelope Advisor: Mark Perepelitza
Design Advisor: Jeff Roberts
Project Management/Daylight Advisor: Lisa Petterson
Energy Advisor: Chris Lowen
Energy Advisor: James Thomas

Related Stories

| Feb 13, 2012

WHR Architects renovation of Morristown Memorial Hospital Simon Level 5 awarded LEED Gold

Located in the Simon Building, which serves as the main entrance leading into the Morristown Memorial Hospital campus, the project comprises three patient room wings connected by a centralized nursing station and elevator lobby.

| Feb 10, 2012

Task force addresses questions regarding visually graded Southern Pine lumber

Answers address transition issues, how to obtain similar load-carrying capabilities, and why only some grades and sizes are affected at this time. 

| Feb 8, 2012

World’s tallest solar PV-installation

The solar array is at the elevation of 737 feet, making the building the tallest in the world with a solar PV-installation on its roof.

| Feb 6, 2012

Kirchhoff-Consigli begins Phase 2 renovations at FDR Presidential Library and Museum

EYP Architecture & Engineering is architect for the $35 million National Archives Administration project.

| Feb 6, 2012

Siemens gifts Worcester Polytechnic Institute $100,000 for fire protection lab renovation

Siemens support is earmarked for the school’s Fire Protection Engineering Lab, a facility that has been forwarding engineering and other advanced degrees, graduating fire protection engineers since 1979.

| Feb 2, 2012

Call for Entries: 2012 Building Team Awards. Deadline March 2, 2012

Winning projects will be featured in the May issue of BD+C. 

| Feb 2, 2012

Mortenson Construction to build 2.4 MW solar project in North Carolina

Located on a 12 acre site in the Sandhills region, the 2.4 megawatt (MW) system is expected to generate approximately 3.5 million kilowatt hours (kWhs) of clean electricity on an annual basis.

| Feb 2, 2012

Fire rated glazing helps historic university preserve its past

When the University embarked on its first major addition since the opening of Hutchins Hall in 1933, preserving the Collegiate Gothic-style architecture was of utmost importance.

| Feb 1, 2012

Replacement windows eliminate weak link in the building envelope

Replacement or retrofit can help keep energy costs from going out the window.

| Feb 1, 2012

Two new research buildings dedicated at the University of South Carolina

The two buildings add 208,000 square feet of collaborative research space to the campus.

boombox1
boombox2
native1

More In Category



Government Buildings

One of the country’s first all-electric fire stations will use no outside energy sources

Charlotte, N.C.’s new Fire Station #30 will be one of the country’s first all-electric fire stations, using no outside energy sources other than diesel fuel for one or two of the fire trucks. Multiple energy sources will power the station, including solar roof panels and geothermal wells. The two-story building features three truck bays, two fire poles, dispatch area, contamination room, and gear storage.


Geothermal Technology

Rochester, Minn., plans extensive geothermal network

The city of Rochester, Minn., home of the famed Mayo Clinic, is going big on geothermal networks. The city is constructing Thermal Energy Networks (TENs) that consist of ambient pipe loops connecting multiple buildings and delivering thermal heating and cooling energy via water-source heat pumps.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021