SmithGroupJJR, one of the nation’s largest architecture, engineering and planning firms, has hired David Winfrey, AIA, LEED AP BD+C, as leader of its Health and Science & Technology Studio at its Dallas, Texas office.
Winfrey joins SmithGroupJJR from Perkins+Will, Dallas, where he served as senior project designer for the new Texas Health Harris Methodist Hospital Alliance campus, Ft. Worth. Completed in 2012 under an integrated project delivery contract, the project included a new $56 million hospital forTexas Health Resources as well as a $6.5 million medical office building forCambridge Holdings, Inc.
Winfrey also served as senior project designer for the 244,000-square-foot, $62 million Methodist Dallas Medical Center Trauma Tower expansion and renovation, Dallas, slated for completion in fall 2014.
“David brings to us tremendous experience in project design and client management. His special expertise in both healthcare and science and technology facilities will be a major benefit to our clients,” said Jay Rambo, director of SmithGroupJJR’s Dallas office.
Winfrey graduated with a Bachelor of Design in Architecture degree from the University of Florida. He is a registered architect in Texas and a member of the American Institute of Architects (AIA).
SmithGroupJJR is a national design leader in both the health and science & technology markets. Among the firm’s notable health work is the 165,000-square-foot Ambulatory Care Center at the Harlingen VA Medical Center, Harlingen, Tex., and multiple hospital and outpatient health centers throughout the Southwest forBanner Health. SmithGroupJJR designed the University of Texas Dallas Founders Building laboratory renovations, adding to the firm’s science and technology portfolio in Texas.
With 800 employees in 10 offices across the U.S., SmithGroupJJR is a national leader in sustainable design.
Related Stories
| Aug 12, 2014
First look: Calatrava's futuristic Main Building opens at Florida Polytechnic University
The $60 million structure is wrapped in a bright-white, aluminum pergola for dramatic effect and solar shading.
| Aug 12, 2014
Shading prototype could allow new levels of environmental control for skyscraper occupants
Developed by architects at NBBJ, Sunbreak uses a unique three-hinged shade that morphs from an opaque shutter to an abstract set of vertical blinds to an awning, depending on what is needed.
| Aug 12, 2014
Design firms invited to submit qualifications for St. Petersburg, Fla., waterfront project
The city of St. Petersburg, Fla., invites firms to submit their ideas for a new and improved pier for Florida's fifth largest city.
| Aug 11, 2014
Air Terminal Sector Giants: Morphing TSA procedures shape terminal design [2014 Giants 300 Report]
The recent evolution of airport terminals has been prompted largely by different patterns of passenger behavior in a post-9/11 world, according to BD+C's 2014 Giants 300 Report.
| Aug 11, 2014
The Endless City: Skyscraper concept connects all floors with dual ramps
Rather than superimposing one floor on top of another, London-based SURE Architecture proposes two endless ramps, rising gradually with a low gradient from the ground floor to the sky.
| Aug 11, 2014
Will Alsop's funky 'high-rise on stilts' will be built over an apartment building in London
South London's riverfront will soon be graced by one of Will Alsop's eccentric designs: a curved apartment tower on purple stilts.
| Aug 11, 2014
New guide for prevention of thermal bridging in commercial buildings
The guide aims to overcome obstacles with respect to mitigating thermal bridging to reduce energy consumption in buildings.
| Aug 8, 2014
LEGO launches set aimed at professional architects
LEGO Architecture Studio is made up of 76 unique elements and over 1,200 pieces, and is intended to give the builder as much freedom as possible.
| Aug 8, 2014
First look: China's latest office development will take the shape of binary code
The Window of Guangzhou project will consist of three towers forming the number sequence "001."
| Aug 8, 2014
Government Sector Giants: Public-sector construction slow, but stirring [2014 Giants 300 Report]
Improving energy performance of existing properties through targeted upgrades and large-scale reconstruction continues to be a federal priority, according to BD+C's 2014 Giants 300 Report.