flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

This will become the first carbon-neutral social housing project in Italy

Sustainability

This will become the first carbon-neutral social housing project in Italy

Barreca & La Varra designed the project.


By David Malone, Associate Editor | August 2, 2019

Renderings courtesy Barreca & La Varra, Wolf Visualizing Architecture

C40 Reinventing Cities, a competition that is part of Milan’s strategic plan to transform underused railway areas on the site of a former freight terminal, recently selected L’INNESTO as its winning project.

The L’INNESTO project area spans 62,000 sm and comprises three parts: the former railway station next to the Greco-Pirelli station, a green area on Via Breda Street, and an abandoned track overlooking the west of theBicocca district.

Upon completion, L’INNESTO will be Italy’s first carbon-neutral social housing project. The project will use a fourth generation district heating system connected to the neighborhood and powered by on-site renewable sources. With a target of 60% green space, L’INNESTO will limit space for cars and prioritize bike parking, electric car charging terminals, and a shared neighborhood car fleet. The design also includes a Human Adaptive Zone, a collaborative neighborhood with an agricultural heart. Rainwater will be 100% reused, which will save 30% on drinking water consumption. 15% of wastewater is treated directly on site.

 

 

The project’s CO2 balance sheet takes into account the construction and the following 30 years of management. L’INNESTO has been designed to achieve a zero balance throughout its life cycle.

The project was proposed by a team including: Fondo Immobiliare Lombardia, InvestiRE SGR (manager), Barreca & La Varra (architect and landscape design), Arup Italia (urban and environmental design), and Stantec (site remediation, wastewater and rainwater management).

Related Stories

Sustainability | Mar 21, 2018

LEED v4.1 — a game changer or business as usual?

The largest number of changes in v4.1 affect materials.

Energy-Efficient Design | Mar 20, 2018

University of Hawaii Maui College on pace to become first U.S. campus to generate 100% renewable energy on-site

The project is part of a partnership with Johnson Controls and Pacific Current that will also allow four UH community college campuses on Oahu to significantly reduce their fossil fuel consumption.

Adaptive Reuse | Mar 8, 2018

LEED Platinum for Memphis industrial reuse project

Memphis-based engineering firm OGCB and contractor Grinder Tabor Grinder led the removal of 54 million lb of concrete and 10 million lb of metal.

Hotel Facilities | Feb 12, 2018

Circular hotel will be world’s first energy positive hotel concept above the Arctic Circle

The hotel will provide 360-degree views of the Svartisen glacier and the surrounding arctic nature.

Wood | Feb 5, 2018

The largest timber office building in the U.S. will anchor Newark, N.J. mixed-use development

Michael Green Architecture is designing the building.

Green | Jan 31, 2018

U.S. Green Building Council releases annual top 10 states for LEED green building per capita

Massachusetts tops the list for the second year; New York, Hawaii and Illinois showcase leadership in geographically diverse locations.

Green | Jan 30, 2018

Welcome to the Jungle: Amazon’s Spheres have opened to employees and the public

The Spheres provide the most unique aspect of Amazon’s downtown Seattle headquarters.

Resiliency | Jan 17, 2018

Climate adaptation project addresses current and future climate changes in Randers, Denmark

The C.F. Møller-designed project is slated for completion in 2021.

Sustainability | Jan 16, 2018

The nation's capital of sustainable design

Major cities, like Washington, D.C., make up less than 2% of the world’s landmass, but they contribute 77% of the world’s CO2 emissions.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021