flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

This will be Fort Lauderdale’s Tallest Building

Multifamily Housing

This will be Fort Lauderdale’s Tallest Building

ODA is designing the project.


By David Malone, Managing Editor | December 22, 2021
300 West Broward exterior
Renderings courtesy VERO Digital

ODA has revealed renderings of its first project in South Florida. 300 West Broward, a 38-story residential project, will act as an urban gateway to the heart of Downtown Fort Lauderdale.

The project will feature two towers that sit atop a 10-story podium and bring together a mixed-use program of 956 units and 23,752 sf of ground level commercial use. The unique bridged massing of the towers will create a focal point for visitors and residents. The design of the elevated massing on the ground floor establishes a new urban connection through the site by creating a covered outdoor space for the neighborhood and a pedestrian friendly connection to the Brightline, the museum, and the surrounding downtown residential blocks.

300 West Broward podium corner

The southwest corner of the podium massing lifts up to create a welcoming plaza and gestures toward the pedestrian traffic from the museum and the Broward Center for the Performing Arts. An arrival plaza on Nugent Avenue creates a welcoming entry space for people coming from Brightline and Las Olas. Both plazas are connected through the ground floor, creating an expansive covered pedestrian realm that will be lined with retail uses and activated year-round.

300 West Broward podium

The top of the podium has an outdoor amenity deck with sunset and sunrise pools, lush landscaping, lounge areas, pergolas, and cabanas. The indoor program features a lounge, a library, and a health and fitness center.

Residential units begin on the 11th floor and continue up through the 48 floors. The top two floors of each tower are reserved for penthouse loft units.

300 West Broward ground level

Related Stories

Multifamily Housing | Mar 24, 2017

Desirable L.A. neighborhood receives new 34-unit residential building

Killefer Flammang Architects designed the urban infill project.

High-rise Construction | Mar 22, 2017

Porsche Design Tower is, unsurprisingly, a car lover’s dream

The idea behind the residential tower was to provide residents with a full single family home in the sky, complete with a private garage and pool.

Multifamily Housing | Mar 15, 2017

Amenity-packed residential building is Zaha Hadid’s only NYC project

The building sits adjacent to New York’s popular High Line park and includes a $50 million penthouse.

Multifamily Housing | Feb 24, 2017

121 East 22nd Street will be the first OMA-designed residential building in NYC

The building will offer 133 units across its 18 stories.

Multifamily Housing | Jan 15, 2017

Multifamily sector expected to stay strong in 2017

Market watchers expect some moderation from record highs, but not much.

Game Changers | Jan 13, 2017

Building from the neighborhood up

EcoDistricts is helping cities visualize a bigger picture that connects their communities.

Multifamily Housing | Jan 11, 2017

Istanbul’s Valens Archway could be rejuvenated with “floating” housing concept

Superspace’s proposal would create a natural promenade atop the ancient stone structure.

University Buildings | Jan 9, 2017

Massive student housing project in Texas will be ready this Fall

Developers hope the early opening of some units sets the tone for the community and future rentals.

boombox1
boombox2
native1

More In Category


Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021