Analysis after major California wildfires revealed acutely toxic and carcinogenic pollutants within drinking water systems making it unsafe to use even after treatment.
Scientists suspect toxic chemicals originated from a combination of burning vegetation, structures, and plastic materials. Chemicals in the air may have also been sucked into hydrants as water pipes lost pressure, and water system plastics decomposed and leached chemicals into water. Toxic chemicals then spread throughout pipe networks and into buildings.
Codes that require builders to install fire-resistant meter boxes and place them farther from vegetation could prevent infrastructure from burning so readily. Concrete meter boxes and water meters with minimal plastic components would be less likely to ignite.
One-way backflow prevention valves at each meter can prevent contamination rushing out of damaged buildings into the larger buried pipe network. Water main shutoff valves and water sampling taps at every water meter box could help responders quickly determine water safety.
Related Stories
Codes and Standards | May 23, 2018
AAMA releases 2017/2018 fenestration market studies
Offers forecasts of industry trends.
Codes and Standards | May 22, 2018
Registration open for 2018 National Energy Codes Conference
U.S. Department of Energy event to be held July 15th-17th in Austin.
Codes and Standards | May 21, 2018
New standard tests quietness of floors
ASTM International method will help manufacturers test their flooring materials.
Codes and Standards | May 17, 2018
California will require solar panels on most new homes
Projected to add $10,000 to cost of new homes.
Codes and Standards | May 16, 2018
New resources offer tips on off-site construction
NIBS documents address using pre-cast concrete, and commercial and legal considerations of modular construction.
Codes and Standards | May 15, 2018
Blast testing of loaded mass timber structures yields positive results
Four tests covered a spectrum of blast loads.
Codes and Standards | May 14, 2018
Maryland makes general contractors liable for failure of subs to pay employees
GCs could have to pay for up to three times the wages owed.
Codes and Standards | May 10, 2018
Data collection, machine learning boost building efficiency
Sensors, software algorithms squeeze out waste.
Codes and Standards | May 9, 2018
OSHA and state safety agencies write more than 100 silica citations in 6 months
Actions tending to come with investigation of other site conditions.
Codes and Standards | May 8, 2018
Powerhouse coalition builds energy positive buildings
The goal: build buildings that provide more power than they cost to build, run, and demolish.