flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Wight & Company announces three hires

Wight & Company announces three hires

Expands team and adds staff to work on the UNO project.


By Posted by Tim Gregorski, Senior Editor | October 30, 2012

Wight & Company, which is involved in architecture, engineering and construction solutions for the built environment, has expanded its team with the addition of three professionals, including:

  • Thomas Williams, PE, AVS brings more than 30 years of experience in transportation to his new role as senior project manager at Wight. He has worked on a wide variety of projects during the course of his career for a number of high-profile organizations, including the CTA, METRA, Utah Transit Authority, Dallas Area Rapid Transit, the City of Orlando, among others. Williams’ experience includes facilitation of value engineering studies for highway and transit projects, feasibility studies, interchange planning and design, and preparation of environmental documents. He is a member of the Institute of Transportation Engineers, American Railway Engineering and Maintenance-of-Way Association, Project Management Institute, and Society of American Value Engineers/SAVE International. Williams holds a Bachelor’s of Science in civil engineering from Cornell University.
  • Christine Dumich joins Wight’s interiors team as a senior interior designer. She is a LEED AP-CI with international experience, having worked on projects in both China and the United Arab Emirates. Before joining Wight, Dumich was an associate at Skidmore, Owings and Merrill, LLP where she focused on corporate, institutional and government projects ranging from 5,000 to three million square feet. Earlier in her career, she held positions at Powell/Kleinschmidt, Leo A Daly Co. and Hobart Heron Architects. She holds a Bachelor’s of Science in architecture from the University of Michigan and a Master’s degree in architecture from the University of California-Los Angeles.
  • Jason Perez brings 10 years of experience as a project engineer and manager to his new role at Wight. He will be working with Wight’s UNO team on the construction of the new UNO Soccer Academy located at 5050 S. Homan in Chicago. Perez has extensive knowledge of K-12, high-rise and tenant build-out projects. He comes to Wight from Turner Construction Company, where he served in a number of roles, including project manager, project engineer and engineer/superintendent, on a wide variety of construction projects in Illinois and Toronto. He graduated from the University of Illinois at Chicago with a Bachelor’s of Science in electrical engineering. +

Related Stories

| Nov 16, 2011

Project completion of BRAC 132, Office of the Chief Army Reserve Building, Ft. Belvoir, Va.

This fast-tracked, design-build project consists of a three-story, 88,470 sf administrative command building housing approximately 430 employees.

| Nov 16, 2011

Architecture Billings Index moves upward

The Architecture Billings Index climbed nearly three points in October. 

| Nov 16, 2011

CRSI recommends return to inch-pound markings

The intention of this resolution is for all new rollings of reinforcing steel products to be marked with inch-pound bar markings no later than January 1st, 2014. 

| Nov 16, 2011

John Patelski joins Ghafari as executive vice president

As executive vice president, Patelski will be responsible for expanding the firm’s services in new strategic markets.

| Nov 15, 2011

Struggling economy demands construction industry embrace enterprise-wide risk management

In today’s business environment of high supply and limited demand, it has become especially vital for organizations in the construction sector to effectively manage risk.

| Nov 15, 2011

Suffolk Construction breaks ground on the Victor housing development in Boston

Project team to manage construction of $92 million, 377,000 square-foot residential tower.

| Nov 15, 2011

Miller joins Perkins Eastman as regional manager, Middle East and Northern Africa

Miller joins Perkins Eastman with more than 48 years of experience in architecture, design management, and construction administration for planning and infrastructure.

| Nov 14, 2011

Summit Design+Build selected at GC for new Office Concepts headquarters

The new headquarters will include 17,000 sf of office space and 15,000 sf of warehouse and feature 24 ft ceilings, an open floor plan, two conference rooms and one training room and will feature sustainable finishes throughout. 

| Nov 14, 2011

Griffin Electric completes electrical work at Cary Arts Center

  The Griffin Electric team was responsible for replacing the previous electrical service on-site with a 1000A, 480/277V service and providing electrical feeds for a new fire pump chiller, six air-handlers and two elevators.

boombox1
boombox2
native1

More In Category


Museums

The Tampa Museum of Art will soon undergo a $110 million expansion

In Tampa, Fla., the Tampa Museum of Art will soon undergo a 77,904-sf Centennial Expansion project. The museum plans to reach its $110 million fundraising goal by late 2024 or early 2025 and then break ground. Designed by Weiss/Manfredi, and with construction manager The Beck Group, the expansion will redefine the museum’s surrounding site.



Reconstruction & Renovation

Movement to protect historic buildings raises sharp criticism

While the movement to preserve historic buildings has widespread support, it also has some sharp critics with well-funded opposition groups springing up in recent years. Some opponents are linked to the Stand Together Foundation, founded and bankrolled by the Koch family’s conservative philanthropic organization, according to a column in Governing magazine.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021