flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

What developers and property owners really want from AEC firms

Building Owners

What developers and property owners really want from AEC firms

Calling all real estate developers, building owners, and facilities directors, BD+C editors would like your expertise and input for our "What Owners Want" editorial research project.


By Robert Cassidy, Executive Editor  | December 16, 2020
What developers and property owners really want from AEC firms

Photo: Ronald Carreño from Pixabay

   

Calling all real estate developers, building owners, and facilities directors, on behalf of my fellow editors at Building Design+Construction, I’d like to invite you – or the appropriate member of your organization – to participate in a short but valuable survey: “What Building Owners + Developers Want from Their Design and Construction Project Teams.”

This survey is for an editorial research project by the BD+C editors that will be published in the February 2021 issue of BD+C, with extended coverage online at BDCnetwork.com throughout February and March. 

PLEASE NOTE: This is NOT a solicitation for sponsorship. There is no cost to your organization.

The survey takes about 3 minutes. By participating, you will gain several exclusive benefits:
• You will get all the data – at no cost – before it is published, without having to register. Others will have to register and pay a fee to get all the data.
• You will discover the most crucial criteria for selecting architects, construction firms, and specialty subcontractors for your projects.
• You will gain insight about the most popular strategies real estate owners and developers are using to achieve building operating efficiency, sustainability, and occupier wellness.
• You will learn how other real estate organizations have responded to the COVID-19 pandemic.

In short, you will gain big ideas and hard data that your organization can use to create even more successful projects in the future.

Your responses will be 100% confidential. All data will be agglomerated for anonymity.

 

 

(Click here to take the survey if the button does not work.)

 

Thanks for your time and valuable input! 

:rob

Robert Cassidy

Executive Editor, Building Design+Construction

Related Stories

| May 28, 2014

Video Blog: How today’s construction firms are bridging the BIM gap

Turner Construction and Parsons Brinckerhoff talk about how BIM has revolutionized the way that they conduct projects, and how technology has allowed them to leverage collaboration in such a way that they can work with decentralized teams.

| May 28, 2014

KPF's dual towers in Turkey will incorporate motifs, symbols of Ottoman Empire

The two-building headquarters for Turkey’s largest and oldest financial institution, Ziraat Bank, is inspired by the country’s cultural heritage. 

| May 28, 2014

Moshe Safdie's twin residential towers in Singapore will be connected by 'sky pool' 38 stories in the air [slideshow]

Moshe Safdie's latest project, a pair of 38-story luxury residential towers in Singapore, will be linked by three "sky garden" bridges, including a rooftop-level bridge with a lap pool running the length between the two structures. 

| May 27, 2014

Supergreen Venter lab displayed in new walk-through video

ZGF Architects' La Jolla building for genomics pioneer J. Craig Venter and his nonprofit research organization aims to be the first net-zero energy, carbon-neutral biological lab. 

| May 27, 2014

America's oldest federal public housing development gets a facelift

First opened in 1940, South Boston's Old Colony housing project had become a symbol of poor housing conditions. Now the revamped neighborhood serves as a national model for sustainable, affordable multifamily design.

| May 27, 2014

One World Trade Center cuts rents due to sluggish activity

Sluggish economy and lackluster leasing force developer The Durst Organization and the Port Authority of New York and New Jersey to reduce asking rents by nearly 10% to $69/sf.

| May 27, 2014

Fire Rated Glass contributes to open lab environment at JSNN

Openness and transparency were high priorities in the design of the Joint School of Nanoscience & Nanoengineering within the Gateway University Research Park in Greensboro, N.C. Because the facility’s nanobioelectronics clean room houses potentially explosive materials, it needed to be able to contain flames, heat, and smoke in the event of a fire. SPONSORED CONTENT 

| May 27, 2014

Contractors survey reveals improving construction market

The construction industry is on the road to recovery, according to a new survey by Metal Construction News. Most metrics improved from the previous year’s survey, including a 19.4% increase in the average annual gross contracting sales volume. SPONSORED CONTENT

| May 27, 2014

How to develop a dynamic referral system

Compelling your clients to provide you with quality referrals is one of the best ways to build a successful business. Here are ways to ‘train’ your clients to make quality referrals. SPONSORED CONTENT

Sponsored | | May 27, 2014

Grim Hall opens the door to fire safety with fire-rated ceramic glass

For the renovation of Lincoln University’s Grim Hall life sciences building into a state-of-the-art computer facility, Tevebaugh Associates worked to provide students and faculty with improved life safety protection. Updating the 1925-era facility's fire-rated doors was an important component of the project. 

boombox1
boombox2
native1

More In Category

Resiliency

Austin area evacuation center will double as events venue

A new 45,000 sf FEMA-operated evacuation shelter in the Greater Austin metropolitan area will begin construction this fall. The center will be available to house people in the event of a disaster such as a major hurricane and double as an events venue when not needed for emergency shelter.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021