Building Design+Construction is currently accepting nominations for the 7th Annual 40 Under 40 program that recognizes the top under-40 professionals in the built environment.
Building Design+Construction’s 40 Under 40 is open to AEC professionals from around the world who are under 40 years old, as of January 1, 2012. Nominees may come from the following fields:
NOMINATION FORM
Click here for a nomination form. Please submit your nominations by January 20, 2012.DON'T BE BASHFUL
Under 40 as of January 1, 2012 and believe you qualify? Feel free to nominate yourself.INTERNATIONAL NOMINEES WELCOME
BD+C’s 40 Under 40 Competition is open to Building Team professionals around the world.QUESTIONS
Click here to view a list of 40 Under 40 Frequently Asked Questions.
- Academia
- Architecture
- Building product inventor/developer
- Building product manufacturing
- Construction
- Construction management
- Design/build
- Engineering (M/E/P, structural, acoustic, etc.)
- Facility management
- Finance (related to construction)
- Government (federal, state, local)
- Interior design
- Marketing
- NGOs, membership, or trade association in the building field
- Nonprofit environmental or development organizations
- Project management
- Property ownership or management
- Real estate development
Note: Individuals whose work is exclusively related to single-family housing or civil engineering are not eligible. Individuals who were previously nominated for BD+C’s 40 Under 40 competition but not selected are eligible. Individuals previously nominated and who were selected as one of BD+C’s 40 Under 40 are not eligible.
Some of the qualities and characteristics the editors will be looking for (in no particular order):
- Leadership skills
- Inventiveness
- Sustained career progress
- People skills
- Client relations
- Academic training
- Dedication
- Personal integrity
- Technical skills
- Community outreach
Nomination forms will be judged by the editors of Building Design & Construction, whose decision is final. BD+C
Related Stories
| Nov 1, 2010
Vancouver’s former Olympic Village shoots for Gold
The first tenants of the Millennium Water development in Vancouver, B.C., were Olympic athletes competing in the 2010 Winter Games. Now the former Olympic Village, located on a 17-acre brownfield site, is being transformed into a residential neighborhood targeting LEED ND Gold. The buildings are expected to consume 30-70% less energy than comparable structures.
| Oct 27, 2010
Grid-neutral education complex to serve students, community
MVE Institutional designed the Downtown Educational Complex in Oakland, Calif., to serve as an educational facility, community center, and grid-neutral green building. The 123,000-sf complex, now under construction on a 5.5-acre site in the city’s Lake Merritt neighborhood, will be built in two phases, the first expected to be completed in spring 2012 and the second in fall 2014.
| Oct 21, 2010
GSA confirms new LEED Gold requirement
The General Services Administration has increased its sustainability requirements and now mandates LEED Gold for its projects.
| Oct 18, 2010
World’s first zero-carbon city on track in Abu Dhabi
Masdar City, the world’s only zero-carbon city, is on track to be built in Abu Dhabi, with completion expected as early as 2020. Foster + Partners developed the $22 billion city’s master plan, with Adrian Smith + Gordon Gill Architecture, Aedas, and Lava Architects designing buildings for the project’s first phase, which is on track to be ready for occupancy by 2015.
| Oct 13, 2010
Editorial
The AEC industry shares a widespread obsession with the new. New is fresh. New is youthful. New is cool. But “old” or “slightly used” can be financially profitable and professionally rewarding, too.
| Oct 13, 2010
Test run on the HP Z200 SFF Good Value in a Small Package
Contributing Editor Jeff Yoders tests a new small-form factor, workstation-class desktop in Hewlett-Packard’s line that combines performance of its minitower machine with a smaller chassis and a lower price.
| Oct 13, 2010
Prefab Trailblazer
The $137 million, 12-story, 500,000-sf Miami Valley Hospital cardiac center, Dayton, Ohio, is the first major hospital project in the U.S. to have made extensive use of prefabricated components in its design and construction.
| Oct 13, 2010
Thought Leader
Sundra L. Ryce, President and CEO of SLR Contracting & Service Company, Buffalo, N.Y., talks about her firm’s success in new construction, renovation, CM, and design-build projects for the Navy, Air Force, and Buffalo Public Schools.
| Oct 13, 2010
Hospital tower gets modern makeover
The Wellmont Holston Valley Medical Center in Kingsport, Tenn., expanded its D unit, a project that includes a 243,443-sf addition with a 12-room operating suite, a 36-bed intensive care unit, and an enlarged emergency department.