flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Western U.S. ports prepare to handle increased shipping from expanded Panama Canal

Industrial Facilities

Western U.S. ports prepare to handle increased shipping from expanded Panama Canal

The expansion of the Panama Canal might make some eastern U.S. ports more attractive to large-vessel operators. But West Coast ports aren’t ready to roll over and play dead just yet.


By John Caulfield, Senior Editor | June 16, 2016
Western U.S. ports are preparing to handle increased shipping from expanded Panama Canal

Rendering of the planned $1.5 billion replacement of the 50-year-old Gerald Desmond Bridge, at the Port of Long Beach, Calif. The new bridge will allow larger, taller vessels to pass under it. Click here to enlarge.

It’s still faster and more cost effective to ship to most parts of the U.S. from West Coast ports than through the Panama Canal, according to a report from CBRE. The Journal of Commerce recently noted that West Coast ports have bounced back from last year’s prolonged longshoremen’s strike and have regained their customary share of containerized imports.

An expanded Panama Canal will cap cargo capacity per vessel at 13,000-14,000 TEU (a measure of container capacity), whereas western ports can already accept vessels with capacities up to 18,000 TEU, according to Dr. Noel Hacegaba, PPM, CPE, Managing Director–Commercial Operations for the Port of Long Beach, Calif.

THE PANAMAX EFFECT

Cities lining the East Coast and Gulf Coast are spending big bucks to accommodate the larger vessels that will cross a wider and deeper Panama Canal.

Last year, Long Beach handled 7.2 million containers, the third best year in its history. Hacegaba says that the Panama Canal expansion might even increase the flow of goods from east to west, especially from eastern South America. “The expansion gives suppliers alternatives,” he says.

Long Beach projects a 4% annual increase in container volume over the next several years. The port is in the midst of a $4 billion infrastructure upgrade over the next decade. Improvements include a fully automated, $1.3 billion Middle Harbor terminal capable of handling 3.3 million TEU. The port is also replacing the 50-year-old Gerald Desmond Bridge—over which 15% of the nation’s goods travel—at a cost of $1.5 billion.

Hacegaba says about 30% of containers leave Long Beach by rail. The port wants to increase rail traffic to 50% to take advantage of rail’s efficiency and environmental cleanliness compared to other transport modes. Long Beach is exploring a short-haul rail operation and an inland container yard.

Hacegaba says 18 million sf of warehouse space lies within 100 miles of the Port of Long Beach, and more is being built. “The port is an economic engine for the Inland Empire,” he says.

Related Stories

Industrial Facilities | Nov 1, 2017

Top 45 industrial engineering firms

AECOM, Fluor, and CRB top BD+C’s ranking of the nation’s largest industrial sector engineering and EA firms, as reported in the 2017 Giants 300 Report.

Giants 400 | Nov 1, 2017

Top 35 industrial architecture firms

Jacobs, Stantec, and BRPH top BD+C’s ranking of the nation’s largest industrial sector architecture and AE firms, as reported in the 2017 Giants 300 Report.

Multifamily Housing | Sep 20, 2017

New housing development rises from a historic textile mill’s ashes

Loft Five50 will add 137 housing units to Lawrence, Mass.

Industrial Facilities | Sep 13, 2017

TRUMPF’s ‘smart factory’ is a factory and showroom in one

The new facility is located in Hoffman Estates, Ill., not far from Chicago O’Hare International Airport.

Industrial Facilities | Aug 29, 2017

Clayco completes construction on Georgia-Pacific Distribution Center

The new facility expands on the company’s old distribution facility by over 300,000 sf.

Transportation & Parking Facilities | Aug 6, 2017

Post Panama Canal expansion, the top three U.S. ports still rule

But land constraints around the terminals are pushing asset prices and rents to new highs.

Office Buildings | Jul 27, 2017

*UPDATED* This will be the largest flight training center in Europe and the Middle East

The center will cover about 30,000 sm and feature 18 simulators.

Industrial Facilities | Jul 26, 2017

EGGER will invest $700 million to build its first U.S. manufacturing facility

The company says the new facility will create 770 jobs over the next 15 years.

Industrial Facilities | Jul 21, 2017

Ridge breaks ground on two industrial buildings at Charleston Logistics Center

The buildings will total 686,300 sf, with each building accounting for 343,150 sf.

Market Data | Apr 13, 2017

2016’s top 10 states for commercial development

Three new states creep into the top 10 while first and second place remain unchanged.

boombox1
boombox2
native1

More In Category


Great Solutions

41 Great Solutions for architects, engineers, and contractors

AI ChatBots, ambient computing, floating MRIs, low-carbon cement, sunshine on demand, next-generation top-down construction. These and 35 other innovations make up our 2024 Great Solutions Report, which highlights fresh ideas and innovations from leading architecture, engineering, and construction firms.


Industrial Facilities

8 ways to cool a factory

Whichever way you look at it—from a workplace wellness point of view or from a competing for talent angle—there are good reasons to explore options for climate control in the factory workplace.


halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021