flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

The Weekly show, Jan 7, 2021: Preconstruction boot camp, and leadership strategies for navigating a challenging market

Contractors

The Weekly show, Jan 7, 2021: Preconstruction boot camp, and leadership strategies for navigating a challenging market

The January 7 episode of BD+C's The Weekly is available for viewing on demand. 


By BD+C Staff | January 7, 2021
The Weekly show, Jan 7, 2021: Preconstruction boot camp, and leadership strategies for navigating a challenging market Expert guests are Steve Wiley, SVP of Preconstruction at James McHugh Construction and Greg Kelly, PE, President and CEO, STV Inc.
The Weekly show, Jan 7, 2021: Preconstruction boot camp, and leadership strategies for navigating a challenging market Expert guests are Steve Wiley, SVP of Preconstruction at James McHugh Construction and Greg Kelly, PE, President and CEO, STV Inc.

This week on The Weekly show, BD+C editors spoke with leaders from James McHugh Construction and STV about:  
• The role of preconstruction in creating successful multifamily housing and other building projects
• Leadership strategies during down markets and STV's growth strategies for 2021 and beyond

 

 

Thanks to our episode sponsor: Life of an Architect podcast 

 

 

 

THE WEEKLY SHOW HIGHLIGHTS FOR JANUARY 7, 2021

BD+C's Group Director Tony Mancini runs down the highlights from this week's show.

 

 

 

SEGMENT #1

Preconstruction boot camp
BD+C Executive Editor Rob Cassidy chats with Steve Wiley, SVP of Preconstruction at James McHugh Construction, about the role of preconstruction in creating successful multifamily housing and other building projects. Wiley discusses how to accurately determine the precise scope of work, how to eliminate risk, and how to construct a responsible budget based on giving the owner/developer a clear vision of the project, via a detailed interactive 3D model. Wiley also covers the importance of using design-build for the major components of a multifamily housing building -- the core and shell structure and the MEP systems -- which account for 50-70% of total costs. 

 

 

SEGMENT #2


STV CEO Greg Kelly on leadership strategies for navigating a challenging market
BD+C's David Barista sits down with STV's new President and CEO Greg Kelly, PE, to discuss leadership strategies during down markets and STV's growth strategies for 2021 and beyond.  

 

 

WATCH ‘THE WEEKLY’ EVERY THURSDAY AT 1 PM EASTERN

“The Weekly” is a presentation of Horizon TV, the online broadcast arm of SGC Horizon LLC, publishers of Building Design+Construction, Multifamily Design+Construction, Professional Builder, ProRemodeler, and Construction Equipment.

 

The Weekly premieres May 18 on Horizon TV

Related Stories

| May 3, 2012

Best commercial modular buildings and marketing programs recognized

Judges scored entries on architectural excellence, technical innovation, cost effectiveness, energy efficiency, and calendar days to complete.

| May 3, 2012

Zero Energy Research Lab opens at North Texas

The living lab—the only one of its kind in Texas—is designed to test various technologies and systems in order to achieve a net-zero consumption of energy.

| May 3, 2012

NSF publishes ANSI standard evaluating the sustainability of single ply roofing membranes

New NSF Standard provides manufacturers, specifiers and building industry with verifiable, objective criteria to identify sustainable roofing products.

| May 3, 2012

Gilbane to provide CM services for North Reading’s integrated middle/high school

The project scope includes a wastewater treatment plant, demolition of the existing high school and extensive athletic fieldwork.

| May 3, 2012

Howard S. Turner 1911–2012

A founding member of the Turner Construction Co.

| May 3, 2012

Ground broken for $94 million hospital expansion at Scripps Encinitas

New facility to more than double emergency department size, boost inpatient beds by 43%.

| May 3, 2012

Rudolph and Sletten, Inc. wins CMAA award

Firm recognized for the renovation of Grossmont-Cuyamaca Community College’s Student Administrative & Griffin Student Center.

| May 2, 2012

Trimble acquires SketchUp 3D modeling platform

The transaction is expected to close in the second quarter of 2012.

| May 2, 2012

Building Team completes two additions at UCLA

New student housing buildings are part of UCLA’s Northwest Campus Student Housing In-Fill Project.

boombox1
boombox2
native1

More In Category




Resiliency

U.S. is reducing floodplain development in most areas

The perception that the U.S. has not been able to curb development in flood-prone areas is mostly inaccurate, according to new research from climate adaptation experts. A national survey of floodplain development between 2001 and 2019 found that fewer structures were built in floodplains than might be expected if cities were building at random.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021