flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

The Weekly show, Jan 7, 2021: Preconstruction boot camp, and leadership strategies for navigating a challenging market

Contractors

The Weekly show, Jan 7, 2021: Preconstruction boot camp, and leadership strategies for navigating a challenging market

The January 7 episode of BD+C's The Weekly is available for viewing on demand. 


By BD+C Staff | January 7, 2021
The Weekly show, Jan 7, 2021: Preconstruction boot camp, and leadership strategies for navigating a challenging market Expert guests are Steve Wiley, SVP of Preconstruction at James McHugh Construction and Greg Kelly, PE, President and CEO, STV Inc.
The Weekly show, Jan 7, 2021: Preconstruction boot camp, and leadership strategies for navigating a challenging market Expert guests are Steve Wiley, SVP of Preconstruction at James McHugh Construction and Greg Kelly, PE, President and CEO, STV Inc.

This week on The Weekly show, BD+C editors spoke with leaders from James McHugh Construction and STV about:  
• The role of preconstruction in creating successful multifamily housing and other building projects
• Leadership strategies during down markets and STV's growth strategies for 2021 and beyond

 

 

Thanks to our episode sponsor: Life of an Architect podcast 

 

 

 

THE WEEKLY SHOW HIGHLIGHTS FOR JANUARY 7, 2021

BD+C's Group Director Tony Mancini runs down the highlights from this week's show.

 

 

 

SEGMENT #1

Preconstruction boot camp
BD+C Executive Editor Rob Cassidy chats with Steve Wiley, SVP of Preconstruction at James McHugh Construction, about the role of preconstruction in creating successful multifamily housing and other building projects. Wiley discusses how to accurately determine the precise scope of work, how to eliminate risk, and how to construct a responsible budget based on giving the owner/developer a clear vision of the project, via a detailed interactive 3D model. Wiley also covers the importance of using design-build for the major components of a multifamily housing building -- the core and shell structure and the MEP systems -- which account for 50-70% of total costs. 

 

 

SEGMENT #2


STV CEO Greg Kelly on leadership strategies for navigating a challenging market
BD+C's David Barista sits down with STV's new President and CEO Greg Kelly, PE, to discuss leadership strategies during down markets and STV's growth strategies for 2021 and beyond.  

 

 

WATCH ‘THE WEEKLY’ EVERY THURSDAY AT 1 PM EASTERN

“The Weekly” is a presentation of Horizon TV, the online broadcast arm of SGC Horizon LLC, publishers of Building Design+Construction, Multifamily Design+Construction, Professional Builder, ProRemodeler, and Construction Equipment.

 

The Weekly premieres May 18 on Horizon TV

Related Stories

| Apr 12, 2011

American Institute of Architects announces Guide for Sustainable Projects

AIA Guide for Sustainable Projects to provide design and construction industries with roadmap for working on sustainable projects.

| Apr 5, 2011

What do Chengdu, Lagos, and Chicago have in common?

They’re all “world middleweight cities” that are likely to become regional megacities (10 million people) by 2025—along with Dongguan, Guangzhou, Hangzhou, Shenzhen, Tianjin, and Wuhan (China); Kinshasa (Democratic Republic of the Congo); Jakarta (Indonesia); Lahore (Pakistan); and Chennai (India), according to a new report from McKinsey Global Institute: “Urban World: Mapping the economic power of cities”.

| Mar 22, 2011

San Francisco ready to test hiring law

San Francisco's new construction law, billed as the nation’s toughest local hiring ordinance, establishes strict requirements for how many work hours on city-financed projects must be completed by city residents, starting with 20% this year. It also requires that a set percentage of hours be performed by low-income workers. The requirements apply to municipal construction projects worth more than $400,000 within 70 miles of the city.

| Mar 15, 2011

Passive Strategies for Building Healthy Schools, An AIA/CES Discovery Course

With the downturn in the economy and the crash in residential property values, school districts across the country that depend primarily on property tax revenue are struggling to make ends meet, while fulfilling the demand for classrooms and other facilities.

| Mar 11, 2011

University of Oregon scores with new $227 million basketball arena

The University of Oregon’s Matthew Knight Arena opened January 13 with a men’s basketball game against USC where the Ducks beat the Trojans, 68-62. The $227 million arena, which replaces the school’s 84-year-old McArthur Court, has a seating bowl pitched at 36 degrees to replicate the close-to-the-action feel of the smaller arena it replaced, although this new one accommodates 12,364 fans.

| Mar 11, 2011

Temporary modular building at Harvard targets sustainability

Anderson Anderson Architecture of San Francisco designed the Harvard Yard childcare facility, a modular building manufactured by Triumph Modular of Littleton, Mass., that was installed at Harvard University. The 5,700-sf facility will remain on the university’s Cambridge, Mass., campus for 18 months while the Harvard Yard Child Care Center and the Oxford Street Daycare Coop are being renovated.

| Mar 11, 2011

Renovation energizes retirement community in Massachusetts

The 12-year-old Edgewood Retirement Community in Andover, Mass., underwent a major 40,000-sf expansion and renovation that added 60 patient care beds in the long-term care unit, a new 17,000-sf, 40-bed cognitive impairment unit, and an 80-seat informal dining bistro.

| Mar 11, 2011

Research facility added to Texas Medical Center

Situated on the Texas Medical Center’s North Campus in Houston, the new Methodist Hospital Research Institute is a 12-story, 440,000-sf facility dedicated to translational research. Designed by New York City-based Kohn Pedersen Fox, with healthcare, science, and technology firm WHR Architects, Houston, the building has open, flexible labs, offices, and amenities for use by 90 principal investigators and 800 post-doc trainees and staff.

boombox1
boombox2
native1

More In Category



Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 


halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021