Blackney Hayes Architects has announced that Radnor Middle School in Wayne, Delaware County, PA has been named a 2012 National Green Ribbon School by the U.S. Department of Education. One of four schools in the Commonwealth to receive this honor, it is also one of only 78 nationwide. Designed by Blackney Hayes, Radnor earned a LEED Silver rating from the USGBC in 2011.
According to the U.S. Department of Education, the Green Ribbon Schools were selected for programs that “save energy, reduce costs, feature environmentally sustainable learning spaces, protect health, foster wellness, and offer environmental education to boost academic achievement and community engagement.”
At 195,000 sf on a 10-acre site, Radnor Middle School features the latest technologies developed for lowering energy and operating costs, including green roofs, daylighting for classroom spaces, geothermal heating and cooling, high recycled content in building materials, and safe, atmosphere-friendly finishes. On the lobby floor, the school district logo is inlaid with terrazzo tile, recycled glass bottles and mirrors, while nearby a Green Touchscreen explains the sustainable features and systems in an interactive format.
In addition to Blackney Hayes Architects, the design and construction team includes Pennoni Associates, Structural Engineer; Concord Engineering Group, MEP Engineer; Gilmore & Associates, Civil Engineer; Cahill Associates, Stormwater Consultant; Metropolitan Acoustics, Acoustical Consultant; Schuler Shook, Theater Consultant; Green Roof Service, Green Roof Consultant; Nash Design Services, Food Service Consultants; Building Science Corporation, Envelope Consultants. +
Related Stories
| Dec 10, 2011
BIM tools to make your project easier to manage
Two innovations—program manager Gafcon’s SharePoint360 project management platform and a new BIM “wall creator” add-on developed by ClarkDietrich Building Systems for use with the Revit BIM platform and construction consultant—show how fabricators and owner’s reps are stepping in to fill the gaps between construction and design that can typically be exposed by working with a 3D model.
| Dec 9, 2011
BEST AEC FIRM 2011: Chapman Construction/Design
Taking sustainable practices to heart.
| Dec 9, 2011
BEST AEC FIRMS 2011: EYP Architecture & Engineering
Expertise-Driven Design: At EYP Architecture & Engineering, growing the business goes hand in hand with growing the firm’s people.
| Dec 8, 2011
Keast & Hood Co. part of Statue of Liberty renovation team
Keast & Hood Co., is the structural engineer-of-record for the year-long $27.25 million renovation of the Statue of Liberty.
| Dec 8, 2011
HDR opens office in Shanghai
The office, located in the Chong Hing Finance Center in Shanghai’s busy Huangpu District, will support HDR’s design efforts throughout Asia.
| Dec 8, 2011
HOK elevates the green office standard
Firm achieves LEED Platinum certification in New York office that overlooks Bryant Park.