flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Wayne, Pa.'s Radnor Middle School wins national green award

Wayne, Pa.'s Radnor Middle School wins national green award

Radnor Middle School among the most sustainable schools in the U.S.


By Posted by Tim Gregorski, Senior Editor | May 21, 2012
Radnor Middle School features the latest technologies developed for lowering ene
Radnor Middle School features the latest technologies developed for lowering energy and operating costs, including green roofs,

Blackney Hayes Architects has announced that Radnor Middle School in Wayne, Delaware County, PA has been named a 2012 National Green Ribbon School by the U.S. Department of Education. One of four schools in the Commonwealth to receive this honor, it is also one of only 78 nationwide. Designed by Blackney Hayes, Radnor earned a LEED Silver rating from the USGBC in 2011.

According to the U.S. Department of Education, the Green Ribbon Schools were selected for programs that “save energy, reduce costs, feature environmentally sustainable learning spaces, protect health, foster wellness, and offer environmental education to boost academic achievement and community engagement.”

At 195,000 sf on a 10-acre site, Radnor Middle School features the latest technologies developed for lowering energy and operating costs, including green roofs, daylighting for classroom spaces, geothermal heating and cooling, high recycled content in building materials, and safe, atmosphere-friendly finishes. On the lobby floor, the school district logo is inlaid with terrazzo tile, recycled glass bottles and mirrors, while nearby a Green Touchscreen explains the sustainable features and systems in an interactive format.

In addition to Blackney Hayes Architects, the design and construction team includes Pennoni Associates, Structural Engineer; Concord Engineering Group, MEP Engineer; Gilmore & Associates, Civil Engineer; Cahill Associates, Stormwater Consultant; Metropolitan Acoustics, Acoustical Consultant; Schuler Shook, Theater Consultant; Green Roof Service, Green Roof Consultant; Nash Design Services, Food Service Consultants; Building Science Corporation, Envelope Consultants. +

Related Stories

| Jun 20, 2022

An architectural view of school safety and security

With threats ranging from severe weather to active shooters, school leaders, designers, and security consultants face many challenges in creating safe environments that allow children to thrive.

School Construction | Jun 20, 2022

A charter high school breaks ground in L.A.’s Koreatown

A new charter school has broken ground in Los Angeles’ Koreatown neighborhood.

Building Team | Jun 17, 2022

Data analytics in design and construction: from confusion to clarity and the data-driven future

Data helps virtual design and construction (VDC) teams predict project risks and navigate change, which is especially vital in today’s fluctuating construction environment.

Sports and Recreational Facilities | Jun 17, 2022

U. of Georgia football facility expansion provides three floors for high-performance training

A major expansion of the University of Georgia’s football training facility has been completed.

Building Team | Jun 16, 2022

Hybrid work expected to reduce office demand by 9%

Businesses are slowly but consistently transitioning to a permanent hybrid work environment, according to a senior economist at Econometric Advisors.

Building Team | Jun 16, 2022

USGBC announces more than 23 million square feet of LEED certified net zero space

Today, the U.S. Green Building Council announced nearly 100 net zero certifications earned under the LEED Zero program, representing more than 23 million square feet of space.

AEC Business Innovation | Jun 15, 2022

Cognitive health takes center stage in the AEC industry

Two prominent architecture firms are looking to build on the industry’s knowledge base on design’s impact on building occupant health and performance with new research efforts.

Market Data | Jun 15, 2022

ABC’s construction backlog rises in May; contractor confidence falters

Associated Builders and Contractors reports today that its Construction Backlog Indicator increased to nine months in May from 8.8 months in April, according to an ABC member survey conducted May 17 to June 3. The reading is up one month from May 2021.

Codes and Standards | Jun 15, 2022

Waived tariffs on solar panels expected to boost solar power

The Biden Administration recently waived tariffs on solar panels from four countries in a move advocates say will accelerate the clean energy transition and benefit national security.

Cultural Facilities | Jun 15, 2022

Gehry-designed Children’s Institute aims to foster community outreach in L.A.’s Watts neighborhood

The Children’s Institute (CII) in Los Angeles will open a 200,000-sf campus designed by Frank Gehry this summer.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021