flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Washington State construction industry restart plan has three phases

Codes and Standards

Washington State construction industry restart plan has three phases

In state with earliest COVID-19 cases, advisory group developing priorities based on risk.


By Peter Fabris, Contributing Editor | May 14, 2020

Courtesy Pixabay

Washington State is developing a three-phase approach to restarting the construction industry after a halt due to the COVID-19 pandemic.

The state with the first reported cases in the U.S., Washington formed a construction advisory group to make recommendations on how to reopen construction activity. That group has sent its plan to Gov. Jay Inslee.

Most of the first-phase projects to reopen could include some commercial, residential, and road building jobs that were already started when the shutdown occurred. These low-risk projects would allow for safe social distancing of six feet of space between workers.

The second phase of projects would include new and existing jobs that can’t consistently conform to social distancing requirements. There would be requirements for personal protective equipment for workers stationed within six feet of each other.

Phase three involves projects with more opportunities for workers to crowd together such as skyscrapers where people have to use elevators and may not have access to hand-washing stations on every floor. The recommendations were a result of collaboration between labor and management. Every decision was reportedly unanimous.

Related Stories

Codes and Standards | Feb 3, 2021

Two new International Code Council online code tools released

Offer detailed information about global building code usage and U.S. adoptions.

Codes and Standards | Feb 2, 2021

Biden tells OSHA to bolster COVID-19 safety rules

Order could lead to a national playbook for fighting COVID-19 on jobsites.

Codes and Standards | Feb 1, 2021

Fenestration Alliance updates standard for mulled combination assemblies

Last updated in 2010, document describes procedures and requirements for air leakage, water resistance, and structural performance.

Codes and Standards | Jan 28, 2021

Natl. Fire Protection Assn. releases new energy storage system fact sheet

Comes as Biden Administration prepares ambitious clean energy agenda.

Codes and Standards | Jan 27, 2021

AECOM sues insurance carrier for payment of COVID-19 property damage claims

Claims ‘all-risk policies’ should have included millions of dollars of losses due to virus.

Codes and Standards | Jan 26, 2021

Updated guide to repair and rehabilitate existing concrete structures published

Document assesses how to adhere to code requirements.

Codes and Standards | Jan 25, 2021

New guide for skylight selection, daylighting design released

Free Fenestration and Glazing Industry Alliance document now available.

Codes and Standards | Jan 20, 2021

Steel industry, labor urge Biden to retain steel tariffs

‘Essential to ensuring the viability of the domestic steel industry.’

Codes and Standards | Jan 19, 2021

2021 Solar Investment Tax Credit will remain at 26%

Incentive was scheduled to be reduced to 22%.

boombox1
boombox2
native1

More In Category

Warehouses

California bill would limit where distribution centers can be built

A bill that passed the California legislature would limit where distribution centers can be located and impose other rules aimed at reducing air pollution and traffic. Assembly Bill 98 would tighten building standards for new warehouses and ban heavy diesel truck traffic next to sensitive sites including homes, schools, parks and nursing homes.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021