flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Washington State construction industry restart plan has three phases

Codes and Standards

Washington State construction industry restart plan has three phases

In state with earliest COVID-19 cases, advisory group developing priorities based on risk.


By Peter Fabris, Contributing Editor | May 14, 2020

Courtesy Pixabay

Washington State is developing a three-phase approach to restarting the construction industry after a halt due to the COVID-19 pandemic.

The state with the first reported cases in the U.S., Washington formed a construction advisory group to make recommendations on how to reopen construction activity. That group has sent its plan to Gov. Jay Inslee.

Most of the first-phase projects to reopen could include some commercial, residential, and road building jobs that were already started when the shutdown occurred. These low-risk projects would allow for safe social distancing of six feet of space between workers.

The second phase of projects would include new and existing jobs that can’t consistently conform to social distancing requirements. There would be requirements for personal protective equipment for workers stationed within six feet of each other.

Phase three involves projects with more opportunities for workers to crowd together such as skyscrapers where people have to use elevators and may not have access to hand-washing stations on every floor. The recommendations were a result of collaboration between labor and management. Every decision was reportedly unanimous.

Related Stories

| Jan 5, 2012

Ontario's stringent energy code has builders concerned over indoor air quality

Some Ontario builders are worried that new building code requirements with stricter energy efficiency measures could lead to poor indoor air quality.

| Jan 5, 2012

New law bars Defense Department from new LEED certifications

The Defense Department will not be allowed to use any money to certify its buildings LEED Gold or Platinum, under a law President Obama signed Dec. 31.

| Jan 5, 2012

Some ADA accessibility rules change in 2012

Some changes to the Americans with Disabilities Act go into effect beginning March 15, 2012.

| Jan 3, 2012

New SJI Rule on Steel Joists

A new rule from the Steel Joist Institute clarifies when local reinforcement of joists is required for chord loads away from panel points. SJI members offer guidance about how and when to specify loads.

| Dec 29, 2011

OSHA enforcing new fall hazard standards

OSHA is enforcing its new fall protection standards, as evidenced by a recent crackdown in New York.

| Dec 29, 2011

NRCA offers program on new fall-protection requirements

The National Roofing Contractors Association's (NRCA's) program "Roofing Industry Fall Protection from A to Z" will be held Feb. 21 during the organization's 125th Annual Convention.

| Dec 29, 2011

Decision not to fireproof the new World Trade Center Transportation Hub criticized

Some criticized the decision, reasoning that the structure could be a terrorist target.

| Dec 29, 2011

Seismic safety in question at thousands of California public schools

California regulators responsible for enforcing earthquake safety laws have failed to certify more than 16,000 construction projects in California public schools, increasing the risk that some projects may be unsafe, according to a state audit report.

| Dec 29, 2011

GreenWizard offers cloud-based LEED credit management, assessment

The company recently began offering companies the ability to run assessments for design credits, in addition to traditional product-specific LEED credits.

| Dec 22, 2011

Federal home weatherization program has impacted 6.8 million homes

More than 6.8 million homes have been weatherized using federal, state, utility, and other funds under the American Recovery and Reinvestment Act.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021