Washington State is developing a three-phase approach to restarting the construction industry after a halt due to the COVID-19 pandemic.
The state with the first reported cases in the U.S., Washington formed a construction advisory group to make recommendations on how to reopen construction activity. That group has sent its plan to Gov. Jay Inslee.
Most of the first-phase projects to reopen could include some commercial, residential, and road building jobs that were already started when the shutdown occurred. These low-risk projects would allow for safe social distancing of six feet of space between workers.
The second phase of projects would include new and existing jobs that can’t consistently conform to social distancing requirements. There would be requirements for personal protective equipment for workers stationed within six feet of each other.
Phase three involves projects with more opportunities for workers to crowd together such as skyscrapers where people have to use elevators and may not have access to hand-washing stations on every floor. The recommendations were a result of collaboration between labor and management. Every decision was reportedly unanimous.
Related Stories
| Jun 1, 2012
New BD+C University Course on Insulated Metal Panels available
By completing this course, you earn 1.0 HSW/SD AIA Learning Units.
| May 31, 2012
Proposed change in Michigan’s building code would hurt innovation, say critics
Legislation pending before the Michigan Senate would change the law that calls for building codes to be updated every three years to require an update only every six years.
| May 31, 2012
Natural gas industry opposes federal carbon-neutral construction rule
The natural gas industry and some allies are working to block a federal green building rule that was expected to be a national model for carbon-neutral construction.
| May 31, 2012
Lawsuits push the legal boundaries of green building definition
This article explores some legal issues stemming from lawsuits in which plaintiffs have charged developers with not delivering on a promised level of sustainability.
| May 31, 2012
ANSI approves Green Building Initiative’s design standard
The Green Building Initiative (GBI), a Portland, Ore. nonprofit organization, has had its new consensus-based standard for the design, construction, and operations of environmentally friendly buildings approved by the American National Standards Institute (ANSI).
| May 31, 2012
USGBC testing Minnesota buildings to see if they are living up to LEED standards
The Minnesota chapter of the U.S. Green Building Council (USGBC) has teamed up with EnergyPrint, a St. Paul, Minn. energy consulting firm, to study the energy and water use of more than 150 buildings in the state that have LEED certification.
| May 29, 2012
Reconstruction Awards Entry Information
Download a PDF of the Entry Information at the bottom of this page.
| May 25, 2012
Major retail chains welcome LEED Volume option
Large national chains such as Starbucks, Marriott, Verizon, and Kohl’s are welcoming the LEED Volume Program that enables them to batch certify similar projects.
| May 25, 2012
Alaska’s okay of gravel aggregate with naturally occurring asbestos opens up development
Some long-delayed projects in the Upper Kobuk region of Alaska may now move forward thanks to legislation that allows construction in areas that have naturally occurring asbestos.