Modo, the first modular apartment building in Washington, D.C. has begun construction. In a period of only eight days 44 custom designed modular boxes shipped from Pennsylvania were lifted into place by crane to create 16 of Modo’s 17 three-bedroom apartments.
The modules arrived onsite 80% finished. Each three-bedroom Modo apartment features built-in custom closets, shelving, desks meant to facilitate remote working, and a spacious living room with a pre-installed jumbo flat-screen TV.
“We were looking for more efficient and environmentally-friendly alternatives to typical construction types,” said Grant Epstein, President of Community Three, the project’s developer, in a release. “Modular construction can reduce construction time by almost one-third, while generating far less onsite construction waste. Construction components typically exposed to the elements – such as windows and wood framing – are built with higher quality because they are assembled indoors. As a result, these modular units offer superior insulation, weather barriers, sound attenuation, and indoor finishes compared with those constructed traditionally.”
The community is designed to appeal to the twenty-somethings of Generation Z, with enough bedrooms to accommodate multiple roommates. An automated entry system will allow tenants to use a smartphone app to access both the building and their apartments.
In addition to the apartments, a concrete-and-steel podium, under construction since April, will house the building’s lobby and a 3,000-sf street-level retail space that can provide over 100 outdoor cafe seats. The lobby will be furnished with a seating area for relaxing, eating, and remote working. A green roof deck with seating and grilling areas will also be included, along with a single penthouse apartment with a private outdoor terrace that is being built on the roof level.
Urban Pace will begin pre-leasing the apartments in March, 2021. Community Three is partnering with Washington, DC-based Rooney Properties on the project. The team worked with the Modular Mobilization Coalition to select Philadelphia-based VBC Construction as modular contractor. VBC in turn partnered with Scranton, PA-based Simplex Homes as the modular fabricator. The manufacturing team worked closely with DC-based project architect Eric Colbert & Associates to ensure seamless integration of market focus and construction methodology.
Related Stories
| Aug 11, 2010
Historic building to be restored in Kansas City
Construction has begun on the conversion of the historic 17-story Home Savings Association building in Kansas City, Mo. The transformed structure, to be known as Grand Boulevard Lofts, will house 134 apartment units. The $18-million project, designed by architect Rosemann & Associates, follows a revitalization of downtown Kansas City, where there is high demand for affordable housing to ser...
| Aug 11, 2010
Old factory converted from hearth to home
A former briquette factory in Cologne-Frechen, Germany, was converted into a mixed-use building by Astoc Architects & Planners, Cologne, in association with Rheinischen Amt für Denkmalpflege—the Rhenish agency for historic preservation. The roughly 172,200-sf building includes a mix of residential condominiums, lofts, and leased commercial space.
| Aug 11, 2010
And the world's tallest building is…
At more than 2,600 feet high, the Burj Dubai (right) can still lay claim to the title of world's tallest building—although like all other super-tall buildings, its exact height will have to be recalculated now that the Council on Tall Buildings and Urban Habitat (CTBUH) announced a change to its height criteria.
| Aug 11, 2010
Luxury high-rise meets major milestone
A topping off ceremony was held in late October for 400 Fifth Avenue, a 57,000-sf high-rise that includes a 214-room luxury hotel and 190 high-end residential condominiums. Developed by Bizzi & Partners Development and designed by Gwathmey Siegel & Associates Architects, the 60-story tower in midtown Manhattan sits atop a smaller-scale 10-story base, which creates a street façade t...
| Aug 11, 2010
Mixed-use Seattle high-rise earns LEED Gold
Seattle’s 2201 Westlake development became the city’s first mixed-use and high-rise residential project to earn LEED Gold. Located in Seattle’s South Lake Union neighborhood, the newly completed 450,000-sf complex includes 300,000 sf of Class A office space, 135 luxury condominiums (known as Enso), and 25,000 sf of retail space.
| Aug 11, 2010
Triangular tower targets travelers
Chicago-based Goettsch Partners is designing a new mixed-use high-rise for the Chinese city of Dalian, located on the Yellow Sea coast. Developed by Hong Kong-based China Resources Land Limited, the tower will have almost 1.1 million sf, which includes a 377-room Grand Hyatt hotel, 84 apartments, three restaurants, banquet space, and a spa and fitness center.
| Aug 11, 2010
Brooklyn's tallest building reaches 514 feet
With the Brooklyner now topped off, the 514-foot-high apartment tower is Brooklyn's tallest building. Designed by New York-based Gerner Kronick + Valcarcel Architects and developed by The Clarett Group, the soaring 51-story tower is constructed of cast-in-place concrete and clad with window walls and decorative metal panels.
| Aug 11, 2010
RMJM unveils design details for $1B green development in Turkey
RMJM has unveiled the design for the $1 billion Varyap Meridian development it is master planning in Istanbul, Turkey's Atasehir district, a new residential and business district. Set on a highly visible site that features panoramic views stretching from the Bosporus Strait in the west to the Sea of Marmara to the south, the 372,000-square-meter development includes a 60-story tower, 1,500 resi...
| Aug 11, 2010
'Feebate' program to reward green buildings in Portland, Ore.
Officials in Portland, Ore., have proposed a green building incentive program that would be the first of its kind in the U.S. Under the program, new commercial buildings, 20,000 sf or larger, that meet Oregon's state building code would be assessed a fee by the city of up to $3.46/sf. The fee would be waived for buildings that achieve LEED Silver certification from the U.
| Aug 11, 2010
Colonnade fixes setback problem in Brooklyn condo project
The New York firm Scarano Architects was brought in by the developers of Olive Park condominiums in the Williamsburg section of Brooklyn to bring the facility up to code after frame out was completed. The architects designed colonnades along the building's perimeter to create the 15-foot setback required by the New York City Planning Commission.