Modo, the first modular apartment building in Washington, D.C. has begun construction. In a period of only eight days 44 custom designed modular boxes shipped from Pennsylvania were lifted into place by crane to create 16 of Modo’s 17 three-bedroom apartments.
The modules arrived onsite 80% finished. Each three-bedroom Modo apartment features built-in custom closets, shelving, desks meant to facilitate remote working, and a spacious living room with a pre-installed jumbo flat-screen TV.
“We were looking for more efficient and environmentally-friendly alternatives to typical construction types,” said Grant Epstein, President of Community Three, the project’s developer, in a release. “Modular construction can reduce construction time by almost one-third, while generating far less onsite construction waste. Construction components typically exposed to the elements – such as windows and wood framing – are built with higher quality because they are assembled indoors. As a result, these modular units offer superior insulation, weather barriers, sound attenuation, and indoor finishes compared with those constructed traditionally.”
The community is designed to appeal to the twenty-somethings of Generation Z, with enough bedrooms to accommodate multiple roommates. An automated entry system will allow tenants to use a smartphone app to access both the building and their apartments.
In addition to the apartments, a concrete-and-steel podium, under construction since April, will house the building’s lobby and a 3,000-sf street-level retail space that can provide over 100 outdoor cafe seats. The lobby will be furnished with a seating area for relaxing, eating, and remote working. A green roof deck with seating and grilling areas will also be included, along with a single penthouse apartment with a private outdoor terrace that is being built on the roof level.
Urban Pace will begin pre-leasing the apartments in March, 2021. Community Three is partnering with Washington, DC-based Rooney Properties on the project. The team worked with the Modular Mobilization Coalition to select Philadelphia-based VBC Construction as modular contractor. VBC in turn partnered with Scranton, PA-based Simplex Homes as the modular fabricator. The manufacturing team worked closely with DC-based project architect Eric Colbert & Associates to ensure seamless integration of market focus and construction methodology.
Related Stories
| Oct 17, 2011
Austin's newest urban apartment complex under construction
Complex sits on a four-acre waterfront site along Lady Bird Lake with spectacular city and lake views, and is slated to open spring 2013.
| Oct 12, 2011
FMI’s Construction Outlook: Third Quarter 2011 Report
Construction Market Forecast: The general economy is seeing mixed signs.
| Oct 6, 2011
GREENBUILD 2011: NEXT Living EcoSuite showcased
Tridel teams up with Cisco and Control4 to unveil the future of green condo living in Canada.
| Sep 29, 2011
Kohler supports 2011 Solar Decathlon competition teams
Modular Architecture > In a quest to create the ultimate ‘green’ house, 20 collegiate teams compete in Washington D.C. Mall.
| Sep 23, 2011
$5M pledge renewed for Habitat for Humanity
The five-year commitment, which will run through 2015, includes $5 million of donated interior and exterior locks and keys for homes built with Habitat for Humanity homeowner partners and volunteers.
| Sep 23, 2011
Under 40 Leadership Summit
Building Design+Construction’s Under 40 Leadership Summit takes place October 26-28, 2011 Hotel at the Monteleone in New Orleans. Discounted hotel rate deadline: October 2, 2011.
| Sep 20, 2011
Jeanne Gang wins MacArthur Fellowship
Jeanne Gang, a 2011 MacArthur Fellowship winner described by the foundation as "an architect challenging the aesthetic and technical possibilities of the art form in a wide range of structures."
| Sep 12, 2011
Living Buildings: Are AEC Firms up to the Challenge?
Modular Architecture > You’ve done a LEED Gold or two, maybe even a LEED Platinum. But are you and your firm ready to take on the Living Building Challenge? Think twice before you say yes.
| Jul 22, 2011
Five award-winning modular innovations
The Modular Building Institute's 2011 Awards of Distinction highlight fresh ideas in manufactured construction projects.