flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Washbar tech: A touchless triple threat

Products and Materials

Washbar tech: A touchless triple threat

New technology from Bradley Corp. is doing all it can to improve the public restroom experience.


By David Malone, Associate Editor | February 10, 2017

Courtesy of Bradley Corp.

Public restrooms are at the top of the list of places where you would like to spend as little time as possible while touching as few things as possible. New technology from Bradley Corp. is doing all it can to improve the public restroom experience.

Verge with WashBar technology provides touchless clean, rinse, and dry functionaility in a single lavatory unit. The WashBar is made up of a piece of chrome-plated stainless steel with LED lighting and easy-to-identify icons on top of the bar that guide users through the clean/rinse/dry process. 

The WashBar forgoes the usual reusable soap tank and instead uses a single-use one-gallon soap container to reduce germ contamination. When the container is empty, it is simply replaced with a full one.

The integrated dryer has been designed to work in tandem with the bowl to eliminate water spray onto the floor or the user. Owners can adjust the air speed of the dryer in instances where a quieter experience is desired or necessary.

Water is dispensed at 0.5 gpm. An ultra-low-flow option (0.35 gpm) is available, as are one-, two-, and three-basin systems. The units are made with Bradley’s Evero quartz material,
a resilient natural composite.

 

Courtesy of Bradley Corp.

Related Stories

| Aug 11, 2010

Education's Big Upgrade

Forty-five percent of the country's elementary, middle, and high schools were built between 1950 and 1969 and will soon reach the end of their usefulness, according to the 2005–2008 K-12 School Market for Design & Construction Firms, published by ZweigWhite, a Massachusetts-based market-research firm.

| Aug 11, 2010

Great Solutions: Technology

19. Hybrid Geothermal Technology The team at Stantec saved $800,000 in construction costs by embedding geothermal piping into the structural piles at the WestJet office complex in Calgary, Alb., rather than drilling boreholes adjacent to the building site, which is the standard approach. Regular geothermal installation would have required about 200 boreholes, each about four-inches in diameter ...

boombox1
boombox2
native1

More In Category

Sustainability

World’s first TRUE Zero Waste for Construction-certified public project delivered in Calif.

The Contra Costa County Administration Building in Martinez, Calif., is the world’s first public project to achieve the zero-waste-focused TRUE Gold certification for construction. The TRUE Certification for Construction program, administered by Green Business Certification Inc. (GBCI), recognizes projects that achieve exceptional levels of waste reduction, reuse, and recycling.




Products and Materials

Top products from AIA 2024

This month, Building Design+Construction editors are bringing you the top products displayed at the 2024 AIA Conference on Architecture & Design. Nearly 550 building product manufacturers showcased their products—here are 17 that caught our eye.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021

Â