flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Wariness of elevators may stymie office reopening

Codes and Standards

Wariness of elevators may stymie office reopening

Workers could balk at returning to high-rises.


By Peter Fabris, Contributing Editor | August 20, 2020

Courtesy Pixabay

A significant number of employees who work in office towers may be reluctant to return to work for fear of contracting the coronavirus in elevators.

That could result in hundreds of billions of dollars’ worth of office real estate continuing to go largely unoccupied. Cities and employers have taken steps to reduce risk, but they may not be enough.

For instance, New York City’s Department of Buildings’ COVID-19 task force has slashed in half the maximum capacity of elevators it oversees. But, previous maximum capacity was so high that the new rule is unlikely to provide comfort for users.

The risk of COVID-19 transmission in elevators is unsettled, but the risk may actually be low, experts say. Most elevators are well ventilated, and the short periods that people occupy the enclosed spaces translates into low risk. Wearing masks, not pressing buttons with bare fingers, and facing to the walls would further reduce the chances of contracting COVID-19 in an elevator.

Related Stories

Codes and Standards | Apr 27, 2017

Extensive list of plug load efficiency utility incentives available for free download

The Dept. of Energy resource is a state-by-state compilation with hundreds of listings.

Codes and Standards | Apr 26, 2017

Chicago commits to 100% renewable power for all city buildings

In doing so, it becomes largest U.S. city to make such a pledge.

Codes and Standards | Apr 25, 2017

Concerns over increased construction costs following Trump executive orders

‘Buy American’ requirement and revised H-1B visa restrictions could raise prices on supplies, labor.

Codes and Standards | Apr 24, 2017

‘Staggering delays, exorbitant costs’ in New York City library, cultural building construction

Study finds significant problems with how city manages capital projects.

Codes and Standards | Apr 20, 2017

California lawmakers have had little success in attracting sports stadiums

Only one of several attempts has had an impact in recent years.

Codes and Standards | Apr 19, 2017

Dept. of Energy releases updated versions of EnergyPlus and OpenStudio building energy modeling tools

The updated versions include full support for variable speed DX coils, enhanced plant auto-sizing, new fan model, and support for non-rectangular windows.

Codes and Standards | Apr 18, 2017

K-12 school daylighting initiative created to promote best practices

Eneref Institute creates networking group of school administrators for ideas to overcome market obstacles.

Codes and Standards | Apr 17, 2017

OSHA delays enforcing crystalline silica standard in construction industry

Enforcement will begin Sept. 23, three months later than planned. 

Codes and Standards | Apr 13, 2017

Former OSHA official publishes safety citations on his own

Under Trump orders, agency had stopped issuing ‘shaming’ press releases on major fines and safety violations.

Codes and Standards | Apr 12, 2017

Trump infrastructure task force suggests arbitration to speed projects

Permitting process could be reduced from 10 years to 2 years under the proposal.

boombox1
boombox2
native1

More In Category

Sustainability

Grimshaw launches free online tool to help accelerate decarbonization of buildings

Minoro, an online platform to help accelerate the decarbonization of buildings, was recently launched by architecture firm Grimshaw, in collaboration with more than 20 supporting organizations including World Business Council for Sustainable Development (WBCSD), RIBA, Architecture 2030, the World Green Building Council (WorldGBC) and several national Green Building Councils from across the globe.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021