flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Walter P Moore opens Mexico City office

Engineers

Walter P Moore opens Mexico City office

The engineering firm has announced its newest international office.


By Walter P Moore | October 5, 2021
Mexico City angel de-la independencia
Courtesy Walter P Moore

Global engineering firm Walter P Moore has opened its sixth international office in Mexico City, Mexico, appointing Miguel Hernández as Manager of Business Development, who will be leading expansion efforts in the area. Service offerings include insurance and litigation support, waterproofing consulting, materials consulting, assessments and repairs, corrosion mitigation, bridge assessment, and flood evaluation among others. The Mexico City office officially opened on August 27, 2021.

“Expanding our presence into Mexico City has been our goal for many years and we are thrilled to have Miguel Hernández on board to represent us in Mexico,” said Dr. Gabriel Jiménez, Managing Principal and Executive Director of Walter P Moore’s Diagnostics Group. “Walter P Moore has built its legacy on exceptional client service, and we can now offer our clients in Latin America a deeper quality of service and partnership with a full team of experts across the region and in Mexico’s largest city.”

Hernández’s expertise includes assessing and designing repairs for distress related to concrete, steel, and masonry structures with a specialization in seismic assessments and retrofits, fire evaluations, building envelope moisture management, and roofing systems.

“I am excited to lead the efforts in growing our presence in Mexico. We are ready to dive in on projects across Mexico and Latin America and to continue tackling existing building problems with creativity, cooperation, and commitment,” Hernández says.

“Our move into Mexico City represents an incredible opportunity to leverage our entire platform more deeply within the international market bringing value to our clients. I am excited about the unique opportunities it presents to build new client relationships in several of our targeted market sectors, especially leveraging our expertise in forensic analysis,” adds Dilip Choudhuri, President and CEO of Walter P Moore.

Tags

Related Stories

Codes and Standards | Jul 15, 2024

New York City code update changes definition of a major building

Changes affecting how construction projects in New York City are permitted will have significant impacts for contractors. On Dec. 11, the definition of a major building in the city’s code will change from 10 stories to seven, or 75 feet. The change will affect thousands more projects.

Adaptive Reuse | Jul 12, 2024

Detroit’s Michigan Central Station, centerpiece of innovation hub, opens

The recently opened Michigan Central Station in Detroit is the centerpiece of a 30-acre technology and cultural hub that will include development of urban transportation solutions. The six-year adaptive reuse project of the 640,000 sf historic station, created by the same architect as New York’s Grand Central Station, is the latest sign of a reinvigorating Detroit.

Healthcare Facilities | Jul 11, 2024

New download: BD+C's 2024 Healthcare Annual Report

Welcome to Building Design+Construction’s 2024 Healthcare Annual Report. This free 66-page special report is our first-ever “state of the state” update on the $65 billion healthcare construction sector.

Transit Facilities | Jul 10, 2024

Historic Fresno train depot to be renovated for California high speed rail station project

A long-shuttered rail station in Fresno, Calif., will be renovated to serve as the city’s high speed rail (HSR) station as part of the California High-Speed Rail Authority system, the nation’s first high speed rail project. California’s HSR system will eventually link more than 800 miles of rail, served by up to 24 stations.

Government Buildings | Jul 8, 2024

GSA adopts new accessibility guidelines for federal properties

The U.S. General Services Administration (GSA) adopted a new rule with new accessibility guidelines for federal buildings. The rule establishes that pedestrian facilities in the public right-of-way are readily accessible to and usable by people with disabilities. 

Office Buildings | Jul 8, 2024

Office vacancy peak of 22% to 28% forecasted for 2026

The work from home trend will continue to put pressure on the office real estate market, with peak vacancy of between 22% and 28% in 2026, according to a forecast by Moody’s.

Virtual Reality | Jul 8, 2024

Can a VR-enabled AEC firm transform your project?

With the aid of virtual reality and three-dimensional visualization technologies, designers, consultants, and their clients can envision a place as though the project were in a later stage.

Green | Jul 8, 2024

Global green building alliance releases guide for $35 trillion investment to achieve net zero, meet global energy transition goals

The international alliance of UK-based Building Research Establishment (BRE), the Green Building Council of Australia (GBCA), the Singapore Green Building Council (SGBC), the U.S. Green Building Council (USGBC), and the Alliance HQE-GBC France developed the guide, Financing Transformation: A Guide to Green Building for Green Bonds and Green Loans, to strengthen global cooperation between the finance and real estate sectors.

Codes and Standards | Jul 8, 2024

New York State building code update would ban fossil fuels in new buildings

New York’s Building Code Council is set to include the All-Electric Buildings Act in its 2025 code update. The Act would ban natural gas and other fossil fuels in new buildings. 

AEC Tech Innovation | Jul 4, 2024

Caution competes with inevitability at conference exploring artificial intelligence for design and construction

Hosted by PSMJ, AEC Innovate in Boston found an AEC industry anxiously at the threshold of change.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021