flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Walter P Moore opens Mexico City office

Engineers

Walter P Moore opens Mexico City office

The engineering firm has announced its newest international office.


By Walter P Moore | October 5, 2021
Mexico City angel de-la independencia
Courtesy Walter P Moore

Global engineering firm Walter P Moore has opened its sixth international office in Mexico City, Mexico, appointing Miguel Hernández as Manager of Business Development, who will be leading expansion efforts in the area. Service offerings include insurance and litigation support, waterproofing consulting, materials consulting, assessments and repairs, corrosion mitigation, bridge assessment, and flood evaluation among others. The Mexico City office officially opened on August 27, 2021.

“Expanding our presence into Mexico City has been our goal for many years and we are thrilled to have Miguel Hernández on board to represent us in Mexico,” said Dr. Gabriel Jiménez, Managing Principal and Executive Director of Walter P Moore’s Diagnostics Group. “Walter P Moore has built its legacy on exceptional client service, and we can now offer our clients in Latin America a deeper quality of service and partnership with a full team of experts across the region and in Mexico’s largest city.”

Hernández’s expertise includes assessing and designing repairs for distress related to concrete, steel, and masonry structures with a specialization in seismic assessments and retrofits, fire evaluations, building envelope moisture management, and roofing systems.

“I am excited to lead the efforts in growing our presence in Mexico. We are ready to dive in on projects across Mexico and Latin America and to continue tackling existing building problems with creativity, cooperation, and commitment,” Hernández says.

“Our move into Mexico City represents an incredible opportunity to leverage our entire platform more deeply within the international market bringing value to our clients. I am excited about the unique opportunities it presents to build new client relationships in several of our targeted market sectors, especially leveraging our expertise in forensic analysis,” adds Dilip Choudhuri, President and CEO of Walter P Moore.

Tags

Related Stories

| Feb 10, 2012

Task force addresses questions regarding visually graded Southern Pine lumber

Answers address transition issues, how to obtain similar load-carrying capabilities, and why only some grades and sizes are affected at this time. 

| Feb 10, 2012

Atlanta Housing Authority taps Johnson Controls to improve public housing efficiency

Energy-efficiency program to improve 13 senior residential care facilities and save nearly $18 million.

| Feb 10, 2012

Besculides joins New York Office of Perkins Eastman as associate principal

Besculides joins with more than 17 years’ experience in design, business development, and account management for the government, healthcare, and corporate practice areas with a particular focus on the financial and media sectors.

| Feb 10, 2012

Mortenson Construction research identifies healthcare industry and facility design trends

The 2012 Mortenson Construction Healthcare Industry Study includes insights and perspectives regarding government program concerns, the importance of lean operations, flexible facility design, project delivery trends, improving patient experience, and evidence-based design. 

| Feb 10, 2012

LAX Central Utility Plant project tops out

Construction workers placed the final structural steel beam atop the Plant, which was designed with strict seismic criteria to help protect the facility and airport utilities during an earthquake.

| Feb 8, 2012

Nauset completes addition and renovation for Winchester senior living community

Theater, library, fitness center, and bistro enhance facility.

| Feb 8, 2012

Mega-malls expanding internationally

Historically, malls have always been the icons of America – the first mall ever was built in Minneapolis in 1956.

| Feb 8, 2012

World’s tallest solar PV-installation

The solar array is at the elevation of 737 feet, making the building the tallest in the world with a solar PV-installation on its roof.

| Feb 7, 2012

AIA introduces seven new contract documents to Documents-On-Demand service??

AIA Contract Documents are widely-used standard form contracts among the building industry to support construction and design projects.

| Feb 7, 2012

Data center construction boom driven by healthcare and technology

The study includes insight and perspective regarding current investment plans of stakeholders, potential challenges to the data center boom, data center efficiency levels, the impact of new designs and technologies, and delivery methods. 

boombox1
boombox2
native1

More In Category

Warehouses

California bill would limit where distribution centers can be built

A bill that passed the California legislature would limit where distribution centers can be located and impose other rules aimed at reducing air pollution and traffic. Assembly Bill 98 would tighten building standards for new warehouses and ban heavy diesel truck traffic next to sensitive sites including homes, schools, parks and nursing homes.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021