flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Walkable areas lead to higher rents for developers

Walkable areas lead to higher rents for developers

Pedestrian-friendly commercial spaces can earn 74% more per square foot


By Peter Fabris, Contributing Editor | June 26, 2014
Photo: Momos via Wikimedia Commons
Photo: Momos via Wikimedia Commons

New research from a George Washington University research group and LOCUS, a coalition of real estate investors that's part of Smart Growth America,says that offices in “Walkable Urban Places (WalkUPs)” bring developers 74% more rent per square foot.

The study, “Foot Traffic Ahead: Ranking Walkable Urbanism in America’s Largest Metros,” also found that areas that rank high for walkable development average 38% higher GDP than lower-ranking communities.

The researchers say that the increase in demand for pedestrian-friendly office buildings is part of a societal shift. “The last time we saw a structural change like this was back in the ’40s and ’50s,” said Christopher Leinberger, one of the authors of the report. “It’s going to take 20 to 30 years to catch up with pent-up demand.”

The study ranks the top 30 U.S. metro areas for their levels of walkable urbanism as well as projecting future rankings. It found 558 “WalkUPS” in those areas, defining them as regionally significant major employment centers. In the top 30 metros, WalkUPS take up just 1% percent of the available acreage, but account for as much as 50% of the office, hotel, apartment, and retail square footage.

Walkable urban developments are not as easy to create as the “formula product” that characterizes drivable suburban development, the study’s authors say. That’s due in part to NIMBYism and more complex permitting and review processes required in urban locations.

(http://www.citylab.com/cityfixer/2014/06/making-the-real-estate-case-for-walkable-urban-places/372968/)

Related Stories

Codes and Standards | Nov 6, 2018

AIA releases 13 new and updated contract documents

Includes new Contractor-Subcontractor Master Agreement.

Codes and Standards | Nov 1, 2018

Several barriers holding back widespread construction of zero energy buildings

Code improvements and voluntary programs could add momentum.

Codes and Standards | Oct 31, 2018

Boston’s new flood protection plan centers on new parks

Initiative would add 67 acres of public open space.

Codes and Standards | Oct 30, 2018

San Francisco plans tougher seismic building codes

Recommendations include addressing geotechnical issues like those faced by Millennium Tower.

Codes and Standards | Oct 26, 2018

Tall Mass Timber code proposals approved at Intl. Code Council public comment hearings

Proposals now go to online voting; final outcome expected in December.

Codes and Standards | Oct 25, 2018

Low-income neighborhoods could benefit most from green roofs

Those areas face the biggest risk from extreme heat.

Codes and Standards | Oct 24, 2018

Building design critical to prevent school shootings

Safety must be balanced with welcoming environment.

Codes and Standards | Oct 23, 2018

Codes in Florida Panhandle made buildings vulnerable to Hurricane Michael

Less stringent codes in northern parts of state linked to devastation.

Codes and Standards | Oct 19, 2018

Global Green Tag production certification standard will launch in U.S. at end of year

Australian program recognized by WELL, claims compliance with LE.

boombox1
boombox2
native1

More In Category

Warehouses

California bill would limit where distribution centers can be built

A bill that passed the California legislature would limit where distribution centers can be located and impose other rules aimed at reducing air pollution and traffic. Assembly Bill 98 would tighten building standards for new warehouses and ban heavy diesel truck traffic next to sensitive sites including homes, schools, parks and nursing homes.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021