flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Walkable areas lead to higher rents for developers

Walkable areas lead to higher rents for developers

Pedestrian-friendly commercial spaces can earn 74% more per square foot


By Peter Fabris, Contributing Editor | June 26, 2014
Photo: Momos via Wikimedia Commons
Photo: Momos via Wikimedia Commons

New research from a George Washington University research group and LOCUS, a coalition of real estate investors that's part of Smart Growth America,says that offices in “Walkable Urban Places (WalkUPs)” bring developers 74% more rent per square foot.

The study, “Foot Traffic Ahead: Ranking Walkable Urbanism in America’s Largest Metros,” also found that areas that rank high for walkable development average 38% higher GDP than lower-ranking communities.

The researchers say that the increase in demand for pedestrian-friendly office buildings is part of a societal shift. “The last time we saw a structural change like this was back in the ’40s and ’50s,” said Christopher Leinberger, one of the authors of the report. “It’s going to take 20 to 30 years to catch up with pent-up demand.”

The study ranks the top 30 U.S. metro areas for their levels of walkable urbanism as well as projecting future rankings. It found 558 “WalkUPS” in those areas, defining them as regionally significant major employment centers. In the top 30 metros, WalkUPS take up just 1% percent of the available acreage, but account for as much as 50% of the office, hotel, apartment, and retail square footage.

Walkable urban developments are not as easy to create as the “formula product” that characterizes drivable suburban development, the study’s authors say. That’s due in part to NIMBYism and more complex permitting and review processes required in urban locations.

(http://www.citylab.com/cityfixer/2014/06/making-the-real-estate-case-for-walkable-urban-places/372968/)

Related Stories

Codes and Standards | Mar 8, 2019

Portland delays requirement for posted warnings on unreinforced brick and stone buildings

Regulation would mandate signs warning that buildings could be unsafe during earthquakes.

Codes and Standards | Mar 7, 2019

California will allow flame retardant-free building insulation

State also repeals business furniture flammability standard.

Codes and Standards | Mar 5, 2019

Persistent flooding having economic impact on coastal cities

Atlantic City, Annapolis among communities affected.

Codes and Standards | Mar 1, 2019

$1 billion Boston hospital project to include extensive disaster resiliency features

Mass. General expansion will be designed for four days of shelter in place.

Codes and Standards | Mar 1, 2019

U.S. cities have become more dangerous for bicyclists and pedestrians

Reduced speed limits, traffic calming, better education seen as keys to improvement.

Codes and Standards | Feb 28, 2019

High-income renters now the fastest-growing housing market segment

Growth is fastest in mid-sized cities with strong economies.

Codes and Standards | Feb 27, 2019

Katerra launches software platform for ‘entire lifecycle of the building process’

Firm is accepting industry applicants to test the product.

Codes and Standards | Feb 26, 2019

AAMA updates two specifications for test methods related to seismic drift

For evaluating window wall, curtain wall and storefront systems.

boombox1
boombox2
native1

More In Category




Government Buildings

OSHA’s proposed heat standard published in Federal Register

The Occupational Safety and Health Administration (OSHA) has published a proposed standard addressing heat illness in outdoor and indoor settings in the Federal Register. The proposed rule would require employers to evaluate workplaces and implement controls to mitigate exposure to heat through engineering and administrative controls, training, effective communication, and other measures.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021