Walgreens announced plans last week to build one of the nation's first net-zero retail stores. The Evanston, Ill., location will utilize solar panels, wind turbines, geothermal technology, LED lighting and ultra-high-efficiency refrigeration to produce energy equal to or greater than the building consumes.
The Chicago-area location will allow convenient access for Walgreens engineers based at the company’s headquarters in Deerfield, Ill., to measure the store’s performance for an entire year to determine if the store reaches its goal of net zero energy use.
Walgreens plans to generate electricity and reduce its usage by more than 40 percent through several technologies in the store including:
- more than 800 roof-top solar panels
- two wind turbines
- geothermal energy obtained by drilling 550-feet into the ground below the store, where temperatures are more constant and can be tapped to heat or cool the store in winter and summer
- LED lighting and daylight harvesting
- carbon dioxide refrigerant for heating, cooling and refrigeration equipment
- energy efficient building materials.
Engineering estimates--which can vary due to factors such as weather, store operations and systems performance- indicate that the store will use 200,000 kilowatt hours per year of electricity while generating 256,000 kilowatt hours per year.
Over the past year, Walgreens engineers have worked with the city of Evanston and vendors, including Trane, CREE Lighting, Acuity Lighting, Cooper Lighting, CalStar Products, GE Lighting, Geothermal International, SoCore Energy, Wing Power and Camburas and Theodore Architects.
(http://news.walgreens.com/article_display.cfm?article_id=5717)
Related Stories
| Oct 14, 2011
ACI partners with CRSI to launch new adhesive anchor certification program
Adhesive anchor installer certification required in new ACI 318-11.
| Oct 14, 2011
Midwest construction firms merge as Black and Dew
Merger is aimed at increasing market sector capabilities and building on communication and core contracting competencies.
| Oct 14, 2011
AIA Continuing Education: optimizing moisture protection and air barrier systems
Earn 1.0 AIA/CES learning units by studying this article and passing the online exam.
| Oct 14, 2011
MaxLite receives 2011 Lighting for Tomorrow honorable mention
The judging panel was particularly impressed with the performance of this fixture.
| Oct 12, 2011
BIM Clarification and Codification in a Louisiana Sports Museum
The Louisiana State Sports Hall of Fame celebrates the sporting past, but it took innovative 3D planning and coordination of the future to deliver its contemporary design.
| Oct 12, 2011
Vertical Transportation Systems Reach New Heights
Elevators and escalators have been re-engineered to help building owners reduce energy consumption and move people more efficiently.
| Oct 12, 2011
Building a Double Wall
An aged federal building gets wrapped in a new double wall glass skin.
Office Buildings | Oct 12, 2011
8 Must-know Trends in Office Fitouts
Office designs are adjusting to dramatic changes in employee work habits. Goodbye, cube farm. Hello, bright, open offices with plenty of collaborative space.
| Oct 12, 2011
FMI’s Construction Outlook: Third Quarter 2011 Report
Construction Market Forecast: The general economy is seeing mixed signs.
| Oct 12, 2011
Bulley & Andrews celebrates 120 years of construction
The family-owned and operated general contractor attributes this significant milestone to the strong foundation built decades ago on honesty, integrity, and service in construction.